Anne Mews Heat Network

Open

Buyers

Value

£500,000

Classifications

  • Boiler installations
  • Auxiliary plant for use with boilers
  • District heating boiler
  • Central-heating radiators and boilers and parts
  • Boilers
  • Boiler installation work

Tags

  • tender

Submission Deadline

4 weeks from now

Published

4 days ago

Description

Replacement of a Gas Fired Boiler in Plant Room
For more information about this opportunity, please visit the Delta eSourcing portal at: 
https://www.delta-esourcing.com/tenders/UK-UK-Dagenham:-Boiler-installations./MUTU69FK9B
To respond to this opportunity, please click here: 
https://www.delta-esourcing.com/respond/MUTU69FK9B

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Replacement heating and mechanical plant

The works involved in this project consist of the replacement of the heating plant and general replacement of mechanical plant within the plant room. The heating plant consists of 3no. condensing units serving 3no. hyrdroboxes, a domestic hot water cylinder and pipes, pumps and ancillaries, protective cages, controls, insulation, valves, sensors etc. The final installation shall provide for good access to provide easy maintenance and potential to remove and replace all plant. Plant should not be installed in locations where access is restricted or difficult. Allow to include for all the BMS, electrical and builders work associated with the mechanical services contract and detailed in this specification and as shown on the drawings. Electrical works are detailed within the this specification. Installed and commissioned to latest issues of relevant British Standards, Water Regulations and Gas Safety Regulations. The contractor shall develop the construction phase drawings in electronic (dwg) format using the current architectural layout. As-built drawings shall be provided to the client as part of the O&M information upon completion of the project. The contractor is responsible for providing the following content or documentation as part of the project construction: 1. Develop the Stage 4 Tender Design into a fully co-ordinated Stage 5 Construction Documentation package 2. Check the provision for and accuracy of the builder's work information issued prior to the award of the contract 3. Detail the final or supplementary builders work information based on manufacturers or sub-contractors design orco-ordination information and provide fully dimensioned drawings. 4. Detail all access requirements, including access in false ceilings, for maintenance & cleaning and provide fullydimensioned and annotated drawings. 5. Design and undertake all acoustic and fire stopping required to facilitate the works 6. Ensure adequate pipework fall gradients are provided. 7. Ensure suitable access to all valve and plant locations for easy access of maintenance personnel. 8. Prepare detailed electrical wiring diagrams of all equipment supplied showing all interconnections between equipment to enable all wiring installations to be undertaken. 9. Ensure sizes indicated on the detailed design information are not invalidated by the selection of alternative routes during co-ordination or selection of alternative manufacturer's equipment. 10. Ensure all alternative proposals including value engineering exercises are fully designed before submitting forapproval. 11. Note and advise the main contractor of all acoustic and fire stopping required to facilitate the works. 12. Any changes to the detailed design drawings and information required as part of a variation or change from specification post contract award shall be undertaken by the contractor and information issued to the CA for approval/comment. 13. Design, supply and install all rectangular builders work openings with both dimensions less than or equal to 200mmand all round builders work openings with a diameter of less than or equal to 200mm.

Katy Reed

Published 4 days ago
Open

5454 - Cwmaber Infants School - Boiler Replacement

Bidders are invited to submit a tender for the provision of two new boilers and associated plant in the boiler room at Cwmaber Infants School. The scope of the project is fully described in this ITT and supporting documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - Carefully survey all services in the existing boiler rooms and remove all redundant mechanical and electrical services including any brackets and containment. When removed, the building structure shall be made good. - The contractor shall install and set to work the two new boilers and flues and configure existing controls for the new boilers. All new and existing services within the boiler room are to insulated as specified. - The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certify them. The timescale for the work is 4 weeks from commencement of the contract. It is planned to carry out these works during term time with no loss of service to the school. If any service shut downs are required these shall be arranged out of hours or at the October half term holiday. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 4-week period given.

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement Department

[email protected]

2082272222

Timeline active

Publish
Bid
Evaluate
Award
Complete