Description

Background to the requirement:
The purpose of this procurement exercise is to appoint a main contractor for works to the hospital’s chimneys funded by NHS Estates Safety Funding 2025/26.  The chimneys in question, constructed around 1988, are approximately 38 meters tall from main plant room level and made of mild steel.  Externally they are located within an internal courtyard of the hospital (no vehicular access) which is approx. 7.5m above the main plant room level.
Customer Objective:
The Salisbury NHS Foundation Trust is seeking to dismantle one of the steel chimney stacks and reduce the height of the remaining stack to improve stabilisation.  This follows appraisal and optioneering studies by engineering consultants, appointed by the Trust.  It is expected that the same consultants will prepare employer’s requirements for this project and be retained by the Trust as technical advisor.  It is anticipated that this appointment of the main contractor will be via a JCT 2024 D&B contract. 
Scope/Specifics:
The scope will potentially involve (in no specific order):
• Dismantling of one chimney stack which currently contains the flues for the CHP (not currently operational) and one back-up generator.
• For the second chimney stack, remove the cap, reduce height of the stack and internal multi flues by approx. 5m (between joints) and replace the cap.  This is to be done in a timely manner to allow for use of gas boilers during the peak of the heating season.  The reduction height is limited by air quality/ emission requirements.
• Re-routing flues or installing new/ diversion flue(s) for plant as necessary (e.g. for one backup generator).
• Decommissioning (or coordination of) for one boiler.
• Any other building services adaptations required to enable completion of work.
• Remove corrosion and reinstate corrosion protection to targeted areas of the retained chimney.
• Reinstatement of bird netting above the courtyard.
• Removal and disposal from site of all waste.
• Temporary works, including any equipment to enable access.
• In situ material testing of the chimney steelwork, notably of the welds.
• Coordination with Trust appointed specialist for removal of monitoring devices on stacks ahead of dismantling/reduction works.
• Subcontracting and coordination of the specialist elements of work with the steel chimneys and building services works in the main energy centre.
• Under CDM act as Principal Contractor and as Principal Designer during the construction phase.
• Appointment of any building services and structural engineering consultants to complete the construction works and produce health and safety file on completion, including updates to the Trust’s 2D and 3D record drawings which will be provided on appointment.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Southern Gateway - Main Contractor

BTQ LLP requires a Main Contractor for its Bristol Temple Meads Southern Gateway Car Park project. The Southern Gateway is a strategically significant infrastructure project forming a key component of the Bristol Temple Quarter (BTQ) regeneration programme-one of the largest city centre regeneration schemes in Europe. The Southern Gateway will deliver a new southern entrance to Bristol Temple Meads Station, enhancing connectivity, enabling sustainable transport modes, and unlocking development potential in the southern part of the BTQ area. The scheme is being delivered by BTQ LLP, a joint venture between Bristol City Council, Homes England, and the West of England Combined Authority. While Network Rail is not a formal member of the LLP, it is considered a critical delivery partner due to its role in station infrastructure and operational integration. The key elements of the proposed development comprise of the following: A 7 storey multi-storey car park (MSCP) at the centre of the site, providing both car parking and motorcycle parking; A 3 storey cycle pavilion at the north-west of site, providing a mixture of secure Sheffield stands and two-tier cycle parking; The creation of a high quality public realm between the MSCP and cycle pavilion, with dwell spaces and areas for temporary pop up uses. As well as hard and soft landscaping and drainage; An improved fully segregated full width pedestrian footway and two-way cycleway adjacent to Bath Road which is intended to connect into future active travel improvements along this section of the highway; A cycle route to the cycle pavilion from the improved cycleway adjacent to Bath Road; 1no. new bus stop with waiting facilities and layby adjacent to Bath Road; A signal-controlled vehicular access junction to the MSCP from Bath Road; and A Network Rail service yard and a relocated RRAP adjacent to the proposed Network Rail service yard.

Katy Reed

Published 12 hours ago
Open

The Cornwall College Group - Penhaligon Building - Ground Floor & Extension Stripout Works - Camborne TR15 3RD

This tender has now been extended to consider structural condition reports due in November 2025 Cornwall College have applied for a funding grant of c £2.5m to undertake refurbishment works to the existing Penhaligon House building at their Camborne Campus, Cornwall. The proposed project involves two key works packages - stripout of the ground floor and extension (ground and first floor) of the existing building, and then refurbishment works to these areas. These packages will be let within the same tender. This tender opportunity is now for the main works and the stripout elements of the project and will still consist of an open single stage traditional tender process. The DfE funding grant agreement which will be in place with Cornwall College will be explicit that all works (and therefore funding expenditure) must be completed by March 2026. This is a hard stop date. Cornwall College have appointed a team of professional consultants to deliver the project. Further details on the team are included in this ITT. Additional information: The Colleges Electronic Tendering System InTend will be used to manage this Tender. To obtain additional detail about this Tender an interested Supplier must register (if not already registered) on the In-Tend procurement portal as follows: Registering your company on In-Tend Supplier Side https://in-tendhost.co.uk/cornwall/aspx/Home • Overview of Portal • Intro to Project Summary Page/ Correspondence box Useful Contact Information: In-Tend Helpdesk 0845 5578079 email: [email protected] All bidders / suppliers are ALSO required to register on the Government Central Digital Platform https://www.gov.uk/government/publications/procurement-act-2023-short-guides/central-digital-platform-factsheet-html

CORNWALL COLLEGE

Published 12 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline planned

Publish
Bid
Evaluate
Award
Complete