Supply and Deliver Quarry Materials

Open

Buyers

Value

£175,000

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • tender

Submission Deadline

2 weeks from now

Published

1 week ago

Description

To supply and deliver various quarry materials to the Dounreay Site

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Brewery Turnback - ES6-8 Civil Engineering

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Ancillary Civil Engineering Scope of Work: The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.

Open

Main Contractors Framework 2026

LSHTM Framework for Main Contractors, to procure works across all campuses of its estate, broken out into the following Lots: Lot 1 – Main Contractor - Carry out construction projects, either as traditional single stage or design and build. Lot 2 – Mechanical, Electrical and Public Health (MEP) Contractor – Predominantly in relation to either large plant replacement, or large scale replacement of for instance light fittings, or distribution pipework but may also cover simple external and internal refurbishment works. With an estimated total value of LSHTM capital projects over the life of the Framework of between £15,000,000 and £63,000,000 GBP based on up to £60,000,000 for lot 1 and up to £3,000,000 for lot 2. These figures cannot in any circumstances be guaranteed and nor should they be taken as a minimum or maximum amount. Typical call-off contract values range from £250,000 - £10,000,000 for lot 1, and £10,000 to £150,000 for lot 2. Please note that refurbishment work in the laboratories is of a highly technical nature, requiring extensive relevant skills and experience. In addition, the refurbishment works generally take place in occupied buildings with other research activities ongoing nearby, requiring careful planning and execution of the works so that no research is interrupted. Due to the criticality of these research activities an ability to react and resource promptly to address technical issues that threaten research continuity is required.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete