PQ0608 - Play Areas - Safety Inspections

Open

Buyers

Value

£40,000

Classifications

  • Technical inspection and testing services
  • Technical inspection services
  • Safety consultancy services

Tags

  • tender

Submission Deadline

2 hours from now

Published

2 weeks ago

Description

Birmingham City Council (the Council) is seeking to appoint an organisation for the provision of safety inspections in play areas.
The contract for the services will commence in October 2025 and will be in place for a period of 3 years.
For the first year of this contract we are also looking to have:-
•	a full DDA (Disability Discrimination Act) report for all facilities
•	a full Play Value assessment for all facilities
There are 239 play areas that require this additional work.
Currently there are 407 facilities across 225 sites across Birmingham City Councils play portfolio.  This consists of: 239 playgrounds, 84 MUGA, 32 Ball Courts,42 Gyms, 12 skate parks
The 6 play areas listed below are part of The Royal Town of Sutton Coldfield (RTSC).  Through the duration of this contract these play areas may be transferred into the ownership of RTSC.  We would need to seek a price for inclusion on an individual basis as the sites may be transferred.
site	playground
rectory park	yes
falcon lodge	yes
harvest fields	yes
withy hill rec	yes
princess Alice	yes
Spring field 	yes
The number of facilities may change over the length of the contract as facilities are decommissioned and new facilities constructed.
Annual Inspection
The Annual inspection will be undertaken by fully trained operatives who have got the RPII (Register of Play Inspectors International) Annual inspection qualification.
The inspection will include all play equipment, surfacing and ancillary items (benches, bins, signs, fencing, gates etc.) associated with the playground feature.
There will be an individual final report for each of the 407 facilities.
The final report for each facility will include:
•	A summary of all equipment associated with the play area
•	An overall photograph of each facility
•	A photograph each item of equipment and ancillary items 
•	A photograph of each defect identified
•	The defects identified need to be available in an excel spread sheet
•	There needs to be a risk assessment for each defect, with recommendations for repair and time scale for repair.
There will be a citywide total summary report produced combining all of the data from each of the individual reports.  This needs to be in a excel format to allow for easy interrogation of the data by the client officer.
Additional Requirements
•	All inspectors need to have an enhanced DBS check
•	All inspectors need to be clearly identifiable 
•	All inspectors need to be identified and recorded with the client
•	Copies of RPII qualifications need to be provided for all inspectors used
•	Any high risk defects need to be reported to the nominated client officer before leaving the site, with a photo and recommendations for how to make the fault safe.
•	The facility reports need to be sent to the client officer at the end of every week
•	The inspectors will need to provide a schedule for the inspections
•	The inspectors will need to inform the client officer if there are any deviations in time scales that will have an impact on the completion of the inspections
The inspections will follow the guidance from the RPII Annual Inspection and the relevant British Standards:-
•	BS EN 1176 Parts 1, 2, 3, 4, 5, 6, 10 & 11 Playground equipment intended for permanent installation outdoors & indoors. 
•	BS EN 1176 Part 7 - ‘Guidance on Installation, Inspection, Maintenance and Operation’ (this document gives guidance to the owners/operators of the facility on the installation, inspection, maintenance and operation of playground equipment, excluding ancillary items).
•	BS EN 15312 Free access multi-sports equipment 
•	BS EN 14974 Skateparks 
•	BS EN 16630 Permanently installed outdoor fitness equipment
The Council will be using its free to use e-tendering system (in-tend) for the administration of this procurement process and potential suppliers must register with the system to be able to express an interest. If you wish to express an interest in this opportunity please click on the following link to access https://in-tendhost.co.uk/birminghamcc/ and submit your details to register. You will then be able to log on which will enable you to download all relevant quotation documentation. 
If you are unable to register with In-tend or have any questions or problems on how to use this web site please either email us at: [email protected]. 
Your completed quotation submission should be returned by 12:00 (noon) on 13th October 2025 via the 'in-tend' system https://in-tendhost.co.uk/birminghamcc

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

ITT for the Procurement of Mechanical & Electrical Works, Goods and Services, and Fire, Safety and Security Works, Goods and Services.

ITT for the Procurement of Mechanical & Electrical Works Goods and Services, and Fire, Safety and Security Works Goods and Services. Unique Identifier: DBCMEFSS0001 Contracting Authority: DACORUM BOROUGH COUNCIL of The Forum, Marlowes, Hemel Hempstead, Hertfordshire HP1 1DN (the “Client”) Contract for Goods/Services or Works: Works, Goods and Services Contract Subject-Matter: This Lot will include, but is not limited to, the Goods and Services identified below, it will include associated services such as new supply connections, general plumbing, pipework, and all other maintenance, replacement, and installation activities directly related to the Goods and Services. 1. Air Conditioning installation, replacement, servicing and maintenance including statutory inspections in relation to EPBD compliance (CIBSE TM44 guidance). 2. Booster Pump Installation 3. Booster Pump Servicing 4. Broadband Installation (Landlord areas) 5. Digital IRS Installation 6. Digital IRS Servicing 7. Disabled Adaptation Installation (M&E – such as audio/visual aids) 8. Disabled Adaptation Servicing (M&E) 9. Commercial Rewire (inc. high voltage) 10. Domestic Rewire 11. EICR (BLOCK) 12. EICR (COMMERCIAL) 13. EICR (DWELLING) 14. Electric Vehicle Charging Installation 15. Electric Vehicle Charging Servicing 16. Fire & Smoke Detection Installation (Domestic Dwellings) 17. Lightning Conductor Installation 18. Lightning Conductor Servicing 19. Portable Appliance (PAT) Testing 20. Rising & Lateral Mains Upgrade (Blocks/Buildings) Fire, Safety and Security This Lot will include, but is not limited to, the below Goods and Services including passive and active fire safety works. The Contracting Authority reserves the right to amend the contents of this Lot. This lot excludes Fire Risk Assessments: 1. Alarm Monitoring Services 2. Automatic Opening Vent Installation 3. Automatic Opening Vent Servicing 4. Automatic Barriers Installation 5. Automatic Barriers Servicing 6. Automatic Doors Installation 7. Automatic Doors Servicing 8. Door Entry Installation (Commercial) 9. Door Entry Installation (Domestic) 10. Door Entry Servicing 11. Dry Riser Servicing 12. Emergency Lighting Installation (Domestic & Commercial) 13. Emergency Lighting Servicing (Domestic & Commercial) 14. Fire Alarm Installation (Domestic & Commercial) 15. Fire Alarm Servicing (Domestic & Commercial) 16. Fall Arrest System Servicing and Remedials 17. Fire Alarm Installation (Communal) 18. Fire Alarm Servicing/Testing 19. Fire Equipment Installation 20. Fire Equipment Servicing/Testing 21. Personal Protection Water Misting System Installation 22. Personal Protection Water Misting System Servicing 23. Sprinkler Installation 24. Sprinkler Servicing 25. Suppression Systems Installation 26. Suppression Systems Servicing 27. Warden Call System Installation 28. Warden Call System Servicing/Testing 29. Wet Riser Servicing Conditions of Participation of the Tender Process, (To be confirmed):

Katy Reed

Published 5 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete