BBV Sublot 4 - HSST1020 - WWH U shape channel cover
Buyers
Value
£1,000,000
Classifications
- Drainage system
Tags
- tender
Submission Deadline
1 week from now
Published
3 days ago
Description
U-trough scope Supply 2000 [two thousand] linear meters of U-trough lids for installation into the Washwood Heath Retained Cut at Railway base slab level. An outline design of the U-trough lid system has been proposed by BBV. See Drawing number 1MC08-BBV_MSD-GT-DDE-NS03_NL08-760255 C01. A similar solution OR an alternative solution is required from the Supplier to satisfy the requirements detailed in 1MC08-BBV_MSD-GT-DDE-NS03_NL08-760255 C01 taking particular care of the resistance to uplift forces and installation methodology. The Supplier's proposed solution will need to conform with the Acceptance Criteria of different stakeholders including HS2 Ltd before being put into production. The Supplier is to manufacture the full quantity of U-trough lids required by BBV in conformance with BBV's Quality Management requirements. The Supplier is to ensure all of the material is delivered safely to the Washwood Heath site and packaged in a way that can be easily lifted by mechanical means. BBV is planning to install the U-trough covers starting April 2026. The Supplier should consider and advise BBV whether they wish to install the U-trough covers. Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline active
Evaluate
Award
Complete