Muck Away Haulage

Open

Value

£300,000

Classifications

  • Construction work

Tags

  • tender

Submission Deadline

1 week from now

Published

6 hours ago

Description

The M3 and Junction 9 (located in Winchester) connects South Hampshire with London, the Midlands and the North.

Traffic levels are heavy at junction 9 between the M3 and A34, resulting in lengthy queues on the northbound off-slip of the M3 and A272 Spitfire Link, affecting journey times and road safety.

The proposal is to make changes to Junction 9 so it has free flowing links between the M3 and A34 in both directions.

The construction would include for the junction to be widened and build two new gyratory bridges allowing the M3 to increase from 3 lanes to 4 lanes. Also, the works would improve NMU facilities in and
around the junction for both pedestrians and cyclists.

Other construction works include but not limited to
the following:
-2no. underpasses for the M3 mainline and A34 Northbound
-1no. pedestrian subway
-9no. MS4s, 1no. long span and 1no. portal gantries
-Footbridge over the River Itchen
-6no. locations for sheet piling locations and 1no. for blockwork retaining wall
-Site wide motorway communications installation
-Site wide vehicle restraint barrier installation

The scope of the works required is for the removal of arisings from the site including concrete, asphalt and inert materials.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete