Further Competition for Britannia Park Tree works - AWARD

Award

Value

£0

Classifications

  • Construction work

Tags

  • award

Submission Deadline

2 months ago

Published

1 week ago

Description

Title Further Competition for Britannia park tree works
      
      Ref SKD 171
      
      Sandwell MBC (" The Council") wishes to Invite qualified and experienced contractors on the Tree Work framework to participate in a quotation exercise for Britannia park tree works
      
      To quote for all year 1 hazardous works in the table provided. Please note 3 separate quotes will be required 
      
      1.	To complete all year 1 hazardous works, Lombardy poplar to be removed and chemically treated ( eco plugs ) and stump grind 3 months later. 
      2.	To complete all year 1 hazardous works, every other Lombardy poplar to be removed and chemically treated ( eco plugs ) and stumps ground 3 months later. The remaining poplar trees to be reduced to previous pruning points. 
      3.	To complete all year 1 hazardous works, Lombardy poplar to be reduced to previous pruning points, none removed. 
      
      Regarding tree number 85 on table, please also give a price to remove the tree and grind stump. 
      
      Job to be completed in late August/early September. 
      
      If a site visit is required, please contact Matt Gardner or Sunish Patel all quotes need to come through in-tend. 
      
      The Council will be using the In-tend e-Tendering System for this Procurement exercise, please visit https://in-tendhost.co.uk/sandwellmbc to access the Sandwell MBC In-tend Supplier Portal.
      
      From here you will be able to register your company, express an interest in the opportunity, and gain immediate access to Quotation or other related documents.
      
      To submit a quotation you will be required to 'Opt In'.
      
      For a Step by Step user guide to the Sandwell MBC In-tend Supplier Portal please click on the `Guidance for Suppliers` section of the website. All procurement responses must be carried out via the Sandwell MBC In-tend Supplier Portal.  
      
      If you require further assistance in respect of the system, please contact the In-tend support team on 0844 272 8810. 
      
      Closing date: Friday 4th July 2024 at 15:00hrs

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Yate Town Council Peg Hill Skatepark Refurbishment Project

Yate Town Council is seeking to appoint a contractor to design and build the refurbishment of the existing Peg Hill Skatepark. The anticipated budget for this project is £450,000 excluding VAT; this value is inclusive of a 10% contingency budget (£45,000). Full procurement description is included within the Peg Hill design brief, however, please find below the project priorities and design specification: The Peg Hill Skate Park refurbishment seeks to achieve the following priorities: a. Provide a 25year life cycle (minimum); b. Use of sustainable, hardwearing materials with long life cycles that are resistant to climate change (extreme wet/ heat) and anti-social behaviour; c. Improved health and safety, areas for weather shade, materials that are low heat conducting d. Low impact on the climate and planet, refurbishing/ reusing/ recycling as much as possible; using materials and practices that are sustainable e.g. low carbon footprint, chemical free, supportive of the local economy and local workforce; e. Value for public investment, a design with low maintenance and risk of repair; f. Expansion of inclusive features e.g. disability, neurodiversity, making space for girls; g. A design suitable for varying abilities and disciplines - beginner to advanced level users, for large and small wheels; h. Refurbishment works must commence on site in Spring 2026 and conclude by 30th September 2026. Tenderers are asked to submit proposals for a refurbishment design of Peg Hill Skate Park that: a. Respond to the priorities outlined in the public survey (Appendix 2, question 7.a within design brief and Project Priorities above. b. Takes place within the current footprint of the skatepark, making best use of the space available, and popular features that could be refurbished/ retained (designs should not include any equipment that requires planning permission, or that exceeds planning and/or safety restrictions, such as permitted development. If post contract signing, design revisions are required to meet planning and/or safety requirements, costs incurred will be the responsibility of the supplier, not Yate Town Council (as per the JCT Design & Build contract clause 2.17.1) c. Retains a below ground bowl feature, identified in a public survey as a high priority; d. Incorporates the most popular design features, identified in the phase 2 public survey (questions 6 and 7, appendix 2 within design brief). Suppliers may also wish to take inspiration from the skate parks identified in question 7, appendix 2 within design brief) e. Emphasises creativity and the importance of allowing for varying levels of interaction with the skateable features, to support varying levels of confidence and ability. The site location and area for works is outlined within the design brief document.

Katy Reed

Published 6 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete