Description

The Bexhill Academy is currently operating on temp boilers and are tendering in order secure an experienced company to supply the academy with boilers. We also expect the awarded bidder to provide a maintenance service to ensure the new boilers are being maintained throughout their lifecycle/contract. 

We do not have an exact budget as this is the first time the academy is procuring for boilers that meet their specification of needs. The academy can provide a Specification that has been developed by a boiler consultant and therefore can supply the tender pack once we have shortlisted candidates.

Please contact our Procurement consultant Mr. Mike Newell via email to request the PQQ. We expect you to submit 5 references where you supplied boilers to the education sector. Providing at least 1 reference for a school within the Bexhill-on-sea region is highly desirable as we may visit to evaluate the reference. 

[email protected]

We intend to publish the tender pack on the 21st May once we have shortlisted candidates.

Additional information: Please request the PQQ from our procurement consultant at Procurement for Schools Mr. Mike Newell at [email protected]

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5454 - Cwmaber Infants School - Boiler Replacement

Bidders are invited to submit a tender for the provision of two new boilers and associated plant in the boiler room at Cwmaber Infants School. The scope of the project is fully described in this ITT and supporting documentation but in summary the scope is: - The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period. - Carefully survey all services in the existing boiler rooms and remove all redundant mechanical and electrical services including any brackets and containment. When removed, the building structure shall be made good. - The contractor shall install and set to work the two new boilers and flues and configure existing controls for the new boilers. All new and existing services within the boiler room are to insulated as specified. - The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certify them. The timescale for the work is 4 weeks from commencement of the contract. It is planned to carry out these works during term time with no loss of service to the school. If any service shut downs are required these shall be arranged out of hours or at the October half term holiday. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 4-week period given.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete