Play areas

Award

Value

£34,794

Suppliers

Classifications

  • Park and playground equipment

Tags

  • award

Submission Deadline

3 months ago

Published

1 week ago

Description

Refurbishment of Beckett Ave Play Area Carlton

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Yate Town Council Peg Hill Skatepark Refurbishment Project

Yate Town Council is seeking to appoint a contractor to design and build the refurbishment of the existing Peg Hill Skatepark. The anticipated budget for this project is £450,000 excluding VAT; this value is inclusive of a 10% contingency budget (£45,000). Full procurement description is included within the Peg Hill design brief, however, please find below the project priorities and design specification: The Peg Hill Skate Park refurbishment seeks to achieve the following priorities: a. Provide a 25year life cycle (minimum); b. Use of sustainable, hardwearing materials with long life cycles that are resistant to climate change (extreme wet/ heat) and anti-social behaviour; c. Improved health and safety, areas for weather shade, materials that are low heat conducting d. Low impact on the climate and planet, refurbishing/ reusing/ recycling as much as possible; using materials and practices that are sustainable e.g. low carbon footprint, chemical free, supportive of the local economy and local workforce; e. Value for public investment, a design with low maintenance and risk of repair; f. Expansion of inclusive features e.g. disability, neurodiversity, making space for girls; g. A design suitable for varying abilities and disciplines - beginner to advanced level users, for large and small wheels; h. Refurbishment works must commence on site in Spring 2026 and conclude by 30th September 2026. Tenderers are asked to submit proposals for a refurbishment design of Peg Hill Skate Park that: a. Respond to the priorities outlined in the public survey (Appendix 2, question 7.a within design brief and Project Priorities above. b. Takes place within the current footprint of the skatepark, making best use of the space available, and popular features that could be refurbished/ retained (designs should not include any equipment that requires planning permission, or that exceeds planning and/or safety restrictions, such as permitted development. If post contract signing, design revisions are required to meet planning and/or safety requirements, costs incurred will be the responsibility of the supplier, not Yate Town Council (as per the JCT Design & Build contract clause 2.17.1) c. Retains a below ground bowl feature, identified in a public survey as a high priority; d. Incorporates the most popular design features, identified in the phase 2 public survey (questions 6 and 7, appendix 2 within design brief). Suppliers may also wish to take inspiration from the skate parks identified in question 7, appendix 2 within design brief) e. Emphasises creativity and the importance of allowing for varying levels of interaction with the skateable features, to support varying levels of confidence and ability. The site location and area for works is outlined within the design brief document.

Katy Reed

Published 1 day ago
Open

EBC EC Oatlands Recreation Ground Sand Pit and Play Equipment

1.1 Elmbridge Borough Council is approaching the market with a view to install items of play equipment and associated Wetpour surfacing, the design, build and creation of a new sand pit in the old paddling pool and removal of the existing sand pit. The design is to include sand play equipment, imaginative toddler equipment and the creation of a seated/picnic area and associated surfacing. 1.2 Remove in entirety the original sand pit including paving / concrete edging and return to grass. Then to supply and install new play equipment and associated rubber wet pour surface. Including creative sand play equipment, four seat springer, infant unit and all associated safety surface: • To supply and install selected new toddler social and interactive play equipment and safety surfacing with imaginative and challenging designs to increase play value. • Install new sand pit within the old paddling pool with interactive sand piay equipment. • To supply and install, picnic benches and seating. • To maintain the council’s high standard of inclusion and creation of a safe play experience for all visitors and users of the site. • Approx. Surface Area: Existing Sand Pit – 48 M/Sq. • Approx. Surface Area: Paddling Pool – 215 M/Sq. • Approx. Surface Area: Picnic and play Area – 300+M/Sq 1.3 To be considered, suppliers are expected to submit a thorough and concise bid response for this tender. In accordance with the Technical Specification document. Suppliers are invited to visit the site prior to submitting a detailed response to ensure they satisfy themselves with the site and requirements to be able to submit an innovative response that ensures compliance and value for money.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete