Design & Build - Waterbeach Railway Station

Award

Value

£30,000,000

Suppliers

Classifications

  • Railway station construction work

Tags

  • award

Submission Deadline

1 year ago

Published

2 months ago

Description

This scheme involves the relocation of Waterbeach Railway Station. \r
Procurement activity includes the detailed design and construction of the scheme via appointment of a main Contractor under NEC Option A. \r
The scheme comprises a new railway station consisting of 2 No. platforms, accessible footbridge, and secondary means of escape (SME), a 200-space car park, taxi and bus drop-off, cycle storage, public realm, and a new access road from Cody Road.  The new highway and car park will be operated and maintained by Cambridgeshire County Council. \r
The scheme also includes the decommissioning and demolition of the existing Waterbeach Railway Station.\r
It is proposed to transfer ownership, operation, and maintenance of the new station to Network Rail.  \r
The current Station Facilities Operator (SFO) is Govia Thameslink Railway operating as Great Northern.\r
The Contractor will carry out the rail works as 'Third Party Works,' as defined in Standard NR/L2/CIV/095 and non-rail works as Outside Party works as defined in NR/L2/CIV/095.\r
The ES4 preliminary design has been completed by WSP as the Lead Designer and it is anticipated this will achieve the 'Approved in Principle' (AIP) milestone prior to the Invitation to Tender (ITT). \r
Sable Leigh Consultancy (SLC) are appointed as 'Project Manager' and Client Representative on behalf of the Greater Cambridge Partnership (GCP). \r
Volker Fitzpatrick has been undertaking Early Contractor Involvement (ECI) activities.  The key outputs of the ECI work will be shared transparently as part of the tender pack.  \r
Network Certification Body (NCB) has also been appointed in ES4 as the independent assessment body for CSM and interoperability.\r
\r
\r
The Authority have invested in an e-tendering tool in order to facilitate its tendering processes in a compliant and transparent manner.\r
\r
Potential Providers will need to register an account via the "Procontract Portal" at https://procontract.due-north.com/Register before being able to view the full tender details.\r
\r
In order to access the tender documentation, click "Find Opportunities", then on the drop-down menu, filter by "Cambridgeshire Public Services" by clicking on "Update" to find the relevant opportunity or alternatively within the organisations drop down select Cambridgeshire County Council to also find the relevant opportunity.\r
\r
\r
UPDATE: The closing date for the SQ has now been moved back to Friday 23 August at 12 noon. \r
\r
We have also taken the opportunity to review the requirements associated with company turnover, this has been reduced, and in line with a revised estimated Contract value for the Design and Construction now put at between £20m and £30m, we can confirm that we are reducing the requirement for bidders to demonstrate a turnover of £30m per annum. \r
\r
\r

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Access for All Rail Programme - Tranche 5

TfGM is looking to establish a contract for the completion of option selection reports (PACE ES3/OSR), completion of outline design (ES4 Form A) and completion of detailed design (ES5 Form B) - "Stage One" and further, construction (ES6-8) - "Stage Two" of rail station enhancement projects. These stations will be funded under the Department for Transport's (DfT) and "City Region Sustainable Transport Settlements (CRSTS)". The project involves upto four Access for All solutions for stations within Greater Manchester: Broadbottom, Hall 'ith Wood, Hattersley and Moorside (called Tranche 5). The AfA Projects at Hall'ith Wood, Broadbottom, Moorside and Hattersley comprise of a combination of new lifts, footbridges and ramp improvements Hall 'ith Wood: • 2 new lifts up to and connections to the existing platforms • Upgraded power supply Broadbottom: • 2 no. lifts and new footbridge/staircases to platform • Upgraded power supply Moorside: • Single lift and link structure to the existing station building • Remodeling of the existing ticket office and possible repairs to a fire damaged section of the roof. • Upgraded power supply Hattersley: • 1 new lift to platform with new footbridge and stairs to platform level • Removal of existing footbridge and modification works to the station building • Development of a link bridge to the Godley Green Housing development in conjunction with Tameside Council (Developer funded) • Upgraded power supply

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete