INFRASTRUCTURE DEVELOPMENT AT CRINGLE DOCK WASTE TRANSFER STATION, SW8
Buyers
Value
£20,000,000
Classifications
- Engineering services
- Technical testing, analysis and consultancy services
- Environmental engineering consultancy services
- Civil engineering consultancy services
- Quantity surveying services for civil engineering works
- Consulting services for water-supply and waste consultancy
- Engineering design services for the construction of civil engineering works
- Building services consultancy services
- Engineering-design services for traffic installations
- Technical inspection services of engineering structures
- Geotechnical engineering services
- Civil engineering support services
- Mechanical engineering services
- Engineering design services for mechanical and electrical installations for buildings
- Construction supervision services
- Structural engineering consultancy services
- Refuse and waste related services
- Waste transfer station
- Health and safety consultancy services
- Architectural, construction, engineering and inspection services
- Architectural design services
- Architectural services for outdoor areas
- Urban planning and landscape architectural services
- Advisory architectural services
- Landscape architectural services
- Architectural services for buildings
- Architectural, engineering and planning services
Tags
- tender
Submission Deadline
2 months from now
Published
15 hours ago
Description
This procurement exercise will be split into two lots, suppliers may bid for either one or both lots: Lot 1 - WASTE AND ENGINEERING CONSULTANCY SERVICES WRWA is seeking Technical Waste and Engineering support with the replacement of its Cringle Dock Waste Transfer Station, to include discussions with stakeholders, assessment of options, design and access plans, consents and permits, procurement of a construction contract, construction management and supervision, and implementation to support the achievement of ‘steady state’ operations at the future redeveloped Cringle Dock. The scope of this contract covers Waste and Engineering consultancy services. To expand, the services shall entail assisting the Authority with: • Overall facility design including waste and other supporting infrastructure; • Mechanical, civil, structural, geotechnical, utilities and other engineering disciplines as appropriate. • Fire protection measures to satisfy insurance requirement. • Environmental permitting; and • Development, co-ordination, management, and submission of engineering, technical, and permitting documentation as appropriate • Further scope of the works is as detailed in the documents provided as Volume Two. • The successful Tenderer must undertake all preparatory work and must commence full service provision under the Contract on the Commencement Date. • Please refer to the Specifications at Volume Two for further details. Lot 3 - ARCHITECT CONSULTANCY SERVICES WRWA is seeking Architectural support with the replacement of its Cringle Dock Waste Transfer Station. The adviser must act as WRWA’s Concept Guardians throughout the life of the project, to ensure the successful delivery of new infrastructure including the look, feel, and performance standards established by WRWA. The scope of this contract covers Architectural consultancy services. To expand, the services shall entail assisting the Authority with: • Concept Architect - (Riba Stages 0-3) Brief preparation, conceptual design of external appearance including development colour scheme from palate of materials (already specified within the DCO), conceptual layout and features, conceptual constructability, evaluation and approval of detailed designs, monitoring of detailed design implementation, approval of final finish. • Executive Architect - (Riba Stages 4-7) Detailed design for external and/or internal appearance as required in accordance with defined colour scheme and material palate including specification of materials and method of installation, ensuring constructability design, costing of detailed design, and implementation of detailed design, handover and use. While the consultant will act as the Concept Architect throughout the appointment, the successful Architect will only act as Executive Architect for those elements of the WRWA’s infrastructure development works which are developed under a traditional construction contract where WRWA directly employs a designer and construction contractor.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Organisation
Timeline active
Evaluate
Award
Complete