Radstock playground equipment upgrade and surface works

Award

Value

£60,000

Classifications

  • Playground equipment

Tags

  • award

Submission Deadline

2 years ago

Published

3 months ago

Description

Tom Huyton Park Radstock is a city spec play park in a Town Centre location. 

The Park is adjacent to the Greenway and cycling network and receives regular visits from many local families. Known as a destination park it caters for both toddlers through to older children, with the well-known Octi-play as the central piece of play equipment. 
The park was initially created in 1998 and much of the equipment although maintained is nearing end of life. 
The Town Council has been maintaining the park since the creation of Radstock Town Council in 2011 and currently reviewing a new lease with Bath & NE Somerset.

A plan is required to upgrade the equipment and realise the cost implications of the park. 

Some of the equipment is repetitive and it would be good to include options for public consultation for any improvements to the area.

This will be the second phase of upgrades to the park. The Ability area receiving upgrades in 2021.

Replacement Park Equipment for Area 2 (Children Zone 6-10yrs old)
Replacement of: 
-	Zip wire (similar replacement).
-	Multi-play Unit /Pongo (new idea)
-	Bruge Unit (new idea)
-	Making good current wet pour surfacing throughout park.
-	The works would be preferred to be completed for Summer 2023
-	It is hoped the work will not require the whole park to be closed.

The Town Council have a preference steal/metal play equipment over wood.

There is also a hope that a train could be introduce link to the heritage of the area.

ROSPA Inspection required on completion.

Applications to:
Town Clerk - George Clutten
01761 437962
[email protected]

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Design, Supply and Installation of Play Park Upgrades

INTRODUCTION Hawkinge Town Council ("the Council") wishes to select and appoint a suitable Contractor for the play park refurbishment works and invites prospective Contractors to submit a quotation to meet the Council's requirements. The Contract - Hawkinge Town Council are looking to upgrade three parks within the town to include improved infrastructure and play equipment. The specific requirements for the above are detailed in the play parks upgrade brief. It should be noted that by submitting a quotation, you confirm that you understand and can meet these requirements. The Contract is anticipated to commence in early 2026 and will continue until completion of a twelve month's defects period of completion of the last park, unless terminated in accordance with the Conditions of the Contract. Hawkinge Town Council are responsible for several play parks around the town. As part of investing in the health and well-being of the residents of Hawkinge a budget has been made available to upgrade three of these parks. The following has been proposed. Pannell Drive £70,000.00 Corbett Road £6,000.00 Uphill £30,000.00 Total proposed budget £106,000.00 The council are looking to maximise the play equipment and play opportunities at each site through this project. We are seeking a contractor with experience in play parks to partner with the council to make this work. This document should be read in conjunction with the following as part of the tender pack: • 3323- Hawkinge Play Parks Refurbishment Preliminaries -2025-09-22 • ITQ Instructions Document - Main Contractor - Hawkinge Play Parks 3323 180925 • ITQ Response Document - Main Contractor - Hawkinge Play Parks 3323 180925 • CDM Pre-Construction Information Pack In addition, there are sets of photos for each park. Where possible the council would like to minimise waste across the works and recycle as much as possible. There may be opportunities to move serviceable equipment from one park to another where for example equipment has been installed for the wrong age group.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Georgina Clutten

[email protected]

01761 437962

Timeline complete

Publish
Bid
Evaluate
Award
Complete