Catterick Town Centre Regeneration

Award

Value

£0

Classifications

  • Engineering works and construction works

Tags

  • award

Submission Deadline

1 year ago

Published

4 days ago

Description

Levelling Up Fund grant funding has been secured to transform Shute Road and Coronation Park in Catterick Garrison to provide a dynamic, well-connected, and inclusive Catterick Garrison town centre focus - Award of Construction contract.

The project will include each of the below elements:
Project 1 - Active pedestrian and cycle connections, increasing footfall whilst reducing carbon emissions. 
Project 2 - Create a new town events square, park activities and community gardens connecting the town via a feature walkway.
Project 3 - A new mixed-use Community and Enterprise Facility to boost economic productivity. This will host facilities including business start-ups, community kitchen, training opportunities, small business incubator units and support community events and park activities. 

This contract has been procured as a 2-stage restricted process via Yorbuild Major Works Contractors Framework.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete