Castle Park Detailed Design

Award

Value

£925,000

Classifications

  • Surveying services

Tags

  • award

Submission Deadline

10 months ago

Published

4 months ago

Description

The regeneration of Castle Park aims to rejuvenate this historic and important urban green space for the city centre, enhancing its ecological, recreational, and cultural value for the community. This project will progress from RIBA Stage 1 (Surveys, Preparation and Brief) through to a planning application and RIBA Stage 3 (Developed Design) to enable the delivery of a comprehensive programme of the phased regeneration of Castle Park. The project includes comprehensive surveys, collaboration with design consultants, comprehensive stakeholder engagement, and consideration of a long-term strategy for the park

Award via SEWTAPS Lot 11

Similar Contracts

Open

PRO004895 Flow and Asset Management Surveys including Wastewater Surveys

United Utilities is looking to re-procure its current framework for Flow and Asset Management Surveys. The framework will constitute 2 Lots: Lot 1 - Wastewater Network Asset Surveys Lot 2 - Flow & Water Quality Surveys Services required under the Lots are as follows: Lot 1: a) Manhole Surveys b) Pumping Station Surveys c) Combined Sewer Overflow ("CSO") Surveys d) Impermeability Surveys e) Drainage Connectivity Surveys Lot 2 services will be required in river, in sewer and in waste water treatment works (WwTW) as follows: a) installing sewer depth and flow monitors, b) river depth monitors, c) river stage boards, d) rain gauges, e) portable wastewater samplers, f) dissolved oxygen/temperature monitors, g) monitoring the equipment either continuously or for wet weather and dry weather events. h) all telemetry raw data, with the exception of rain gauges to be capable of being viewed live via a website and downloaded by the Procurer at all times. i) collection and processing of data in accordance with the requirements of the Call-Off Particulars of the required Survey, and j) production of reports in accordance with the requirements of the Call-Off Particulars of the required Survey. Surveys in a river may include Time of Travel Surveys and river flow gaugings together with continuous monitoring for the following: a) Time of travel surveys b) River flow gauging c) Continuous monitoring of: i) dissolved oxygen (mg/l) ii) dissolved oxygen (% Saturation) iii) temperature iv) phosphorus v) phosphate vi) pH monitoring vii) turbidity viii) chlorophyll ix) conductivity x) ammonium Surveys in WwTW will comprise a combination of flow and quality monitoring. Surveys may be for flow alone or for flow and quality monitoring combined. Surveys may be for sewer, river or treatment works in isolation or in combination The services required are to be provided in Cheshire, Merseyside, Manchester, Lancashire and Cumbria.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete