G5-2E_HCC_041 Southampton TCF - A27 Providence Hill Cycle Link

Award

Value

£1,927,499

Classifications

  • Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Tags

  • award

Submission Deadline

1 year ago

Published

4 months ago

Description

A call-off from Lot 2 (East) of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (award notice published 01 February 2024). 

The S-TCF - Providence Hill Cycle Link scheme is to provide a new cycle link, combining both enhanced shared-use facilities and an on-carriageway bidirectional segregated cycle lane, on an approximately 820m stretch of the A27 between its junctions with Portsmouth Road and Church Lane it includes: - 
• New signal-controlled crossing at Portsmouth Road junction 
• New signal-controlled crossing at Blundell Lane junction 
• The on-carriageway bidirectional cycle lane shall be segregated with Cycle Lane Defenders 
• Priority crossings across Windmill Lane, Long Lane, Yachtsman's Close and Long Lane junctions 
• Carriageway inlay, new kerbing and footway, signing and lining 
• New street lighting

Similar Contracts

Open

Access for All Rail Programme - Tranche 5

TfGM is looking to establish a contract for the completion of option selection reports (PACE ES3/OSR), completion of outline design (ES4 Form A) and completion of detailed design (ES5 Form B) - "Stage One" and further, construction (ES6-8) - "Stage Two" of rail station enhancement projects. These stations will be funded under the Department for Transport's (DfT) and "City Region Sustainable Transport Settlements (CRSTS)". The project involves upto four Access for All solutions for stations within Greater Manchester: Broadbottom, Hall 'ith Wood, Hattersley and Moorside (called Tranche 5). The AfA Projects at Hall'ith Wood, Broadbottom, Moorside and Hattersley comprise of a combination of new lifts, footbridges and ramp improvements Hall 'ith Wood: • 2 new lifts up to and connections to the existing platforms • Upgraded power supply Broadbottom: • 2 no. lifts and new footbridge/staircases to platform • Upgraded power supply Moorside: • Single lift and link structure to the existing station building • Remodeling of the existing ticket office and possible repairs to a fire damaged section of the roof. • Upgraded power supply Hattersley: • 1 new lift to platform with new footbridge and stairs to platform level • Removal of existing footbridge and modification works to the station building • Development of a link bridge to the Godley Green Housing development in conjunction with Tameside Council (Developer funded) • Upgraded power supply

Katy Reed

Published 2 months ago
Open

Minor and Major Highways Works Framework

This is notification of an upcoming opportunity, in which Slough Borough Council intends to undertake a procurement exercise aimed at setting up a Framework to procure the services of contractors to undertake emergency maintenance, site investigations, minor & major highways and transport works It is anticipated that framework will comprise of 5 lots as follows ( which are subject to change before tender is issue) 1) Lot 1 - Minor Works Construction Project - value range £500,000.00 per contract 2) Lot 2 - Minor Works Construction Projects - value ranges £500,000.00 to £2,000,000.00 per contract 3) Lot 3 - Major Construction Projects - value ranges £2,000,000.00 to £10,000,000.00 per contract 4) Lot 4 - Re-active maintenance works up to the value of £100,000.00 per contract Sublots under Lot 4 are Lot 4a – Adjustment of iron work Lot 4b – Bridge Inspections Lot 4c – Carriageway patching works Lot 4d – Drainage cleansing & CCTV Management Lot 4e – Site Investigations Lot 4f -Supply of Traffic Management Lot 4g – Road Markings Lot 4h – Traffic Sign supply & installation 5) Lot 5 - Carriageway Resurfacing Works up to the value of £1,000,000.00 per contract Each lot will list a number of contractors whose services are to be procured to deliver these works via mini competitions or Direct Awards, and call off contracts are to be awarded using Engineering Construction Contracts (ECC) NEC4 Option A or B Contract duration will be for a period of 3 years, with option to extend it for a further 2 year, on an annual basis of 1 + 1 Indicative Procurement Timelines are Issue of Tender Documents & Tender Notice - By the end of October 2025 Tender Return - January 2026 Anticipated Contract Award Notice – May 2026

Katy Reed

Published 3 months ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete