Contract Award Notice Title Brook House - EML System Ground Floor Phase 2

Award

Value

£28,327

Suppliers

Classifications

  • Emergency lighting equipment

Tags

  • award

Submission Deadline

10 months ago

Published

2 months ago

Description

A Description of the Goods,  Services or Works that are being ordered	Replacement of existing Emergency Lighting System with a new SMART SELF TEST system. This is due to existing system being obsolete and incurring high replacement costs from suppliers. Site Is a multiuse occupancy site over 4 floors. Due to the lack of EML and therefore lack of illumination of escape routes, urgent replacement is required to ensure continued operations throughout the building. The most economical and sift procedure is single quote with a phased approach to allow relocation of end users. This upgrade will future proof site and can be monitored from via an app / website.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Active Fire Framework 2025

The scope of this Framework Agreement is for the provision of active fire products and services. The Framework will cover, but is not limited to: •Risk assessments; inspections; fire equipment testing; and portable appliances testing •Fire products including fire detectors; manual and automatic action products; and fire-retardant products •Servicing and maintenance; fire safety and remedial works; security and access systems; emergency lighting; fire damper and fire collar maintenance; and minor works and servicing. The products and services shall fall into 4 separate Framework “LOTs”, further broken down into Sub-Lots, to reflect the structure of the industries. Supply Partners are invited to apply for one or more LOT(s) if applicable. LOT 1: Fire Products- Supply and Installation Sub-Lot 1.1 Fire Detection Sub-Lot 1.2 Smoke Control Systems Sub-Lot 1.3 Sprinkler System Sub-Lot 1.4 Misting System Sub-Lot 1.5 Fire Extinguisher Sub-Lot 1.6 Emergency Lighting Sub-Lot 1.7 Fire Alarm Monitoring Sub-Lot 1.8 Fire Escape Products Sub- Lot 1.9 Defibrillators LOT 2: Consultancy Sub-Lot 2.1 Fire Risk Assessments Sub-Lot 2.2 Fire Risk Inspections Sub-Lot 2.3 Fire Engineering LOT 3: Servicing Sub-Lot 3.1 Fire Servicing and Maintenance Sub-Lot 3.2 Fire Safety, Minor and Remedial Works Sub-Lot 3.3 Emergency Lighting Maintenance Sub-Lot 3.4 Fire Damper and Fire Collar Maintenance Sub-Lot 3.5 Fire Extinguisher Maintenance Sub-Lot 3.6 Maintenance of Defibrillators Sub-Lot 3.7 Fire Escape Products Maintenance Sub-Lot 3.8 Sprinkler Systems Service and Maintenance Sub-Lot 3.9 Misting System Service and Maintenance LOT 4: Fully Managed Service To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=969251536

Katy Reed

Published 1 month ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete