Dorset Peat Partnership restoration works - Greenlands 2025

Open

Value

£120,000

Classifications

  • Agricultural, farming, fishing, forestry and related products

Tags

  • tender

Submission Deadline

2 weeks from now

Published

1 week ago

Description

Site works to restore two areas of the Greenlands mire system within the Purbeck Heaths National Nature Reserve, as part of a wider project led by the Dorset Peatland Partnership. The aim is to secure peat forming habitats, improve peat condition, slow flow rates and maximise Carbon capture within currently degraded mire systems.
This will be achieved using a range of sensitive restoration techniques that are described in more detail in the attached restoration plans and project specifications. Activities include creating peat bunds and in-channel dams, mulching molinia vegetation and gorse; and earthworks to infill drainage channels.
Contractors will be chosen based on capacity, capability, relevant experience including of working in sensitive habitats on protected sites, proposed solution and cost.
Full details including of how to apply are in the attached Request for Proposals document.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

MFF167 2025-2028 Moorland Restoration Ground Works

1.The objective of this Contract is to deliver a suite of Moorland Restoration Works on 2 areas in the Upper Derwent Valley in the Peak District National Park. The sites are split into 6 packages of Works. The aim of the Works suites are to stabilise and revegetate bare peat, restore hydrology, and increase biodiversity on the Sites. 2. The Works contain multiple years with work periods between August 2025 and 31st March 2028. 3. The Works comprise the following tasks: a. Supply and delivery of Materials required to complete the Works, unless otherwise stated. b. Appropriate storage of Materials, as necessary. c. Supply and delivery of suitable Trackway for storing materials on (see Packages if required). d. Forwarding of Materials and Equipment required to complete the Works to and within Works Sites, excluding Airlifting e. Planning the Aerial Load Lifting Works, including marking out drop locations and working in collaboration with the Authorities Airlifting Contractor to deliver the works f. Marshalling of Aerial Load Lifting, including materials drops g. Installation of Stone Dams into gullies h. Installation of Peat Dams into gullies i. Re-profiling of hags and gully sides j. Installation of Timber Dams into gullies k. Installation of Heather Bales/coir logs into gullies and peat pans l. Spreading of Heather Brash on bare peat m. Supply of lime and fertiliser (NOT seed) n. Spreading of Lime, Seed, and Fertiliser o. Planting of sphagnum plug plants p. Planting of vascular plug plants q. Cutting and bagging of heather brash and bales r. Removal of Waste Materials from Sites. 4. Total Works Brash - 2333 Lime seed and fertiliser - 27.53 Supply of Heather Brash - 1408 Supply of Heather Bales - 150 Gully Blocking - Coir Logs - 396 Gully Blocking Peat Dams - 390 Gully Blocking Stone dams - 1338 Gully blocking - Timber dams - 750 Reprofiling - 2700 Sphagnum planting - 610000 Vascular Plug planting - 103500 Sphagnum Pool mix planting - 16680

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete