Design and Construction of 32 No Apartments at 431 and 433 Hagley Road, Edgebaston, Birmingham

Award

Value

£0

Classifications

  • Construction work

Tags

  • award

Submission Deadline

7 months ago

Published

4 months ago

Description

The works include the design and build 32 homes consisting of 2 and 3 bedroom apartments and associated communal facilities, together with all associated external works, including communal gardens, parking, bin stores, cycle racks, drainage, services and highway works at 431/433 Hagley Road, Edgebaston

This underlying contract is awarded via direct selection from the EN: Procure New Build Framework Gen 4, Lot 3 - New Build Construction of Schemes between 30-100 units. (OJEU Contract notice - 2023/S 000-015713; OJEU Award Notice - 2024/S 000-007099).

Similar Contracts

Open

HVAC at Energy House 1

1.1.1 The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2 The University operates two unique research facilities: Energy House 1 and Energy House 2.0. Both facilities contain environmental climate chambers that house test buildings. Energy House 1, located in the Cockcroft building, features a Victorian End Terrace House and was the first of its kind when constructed. The chamber enables the simulation of a wide range of European weather conditions, allowing for the testing of construction products and heating systems under controlled conditions environments. The environmental chamber has a dedicated heating and ventilation and air conditioning (HVAC) system. 1.1.3 After more than 10 year in operation, Energy House 1 is experiencing maintenance and performance issues with its existing HVAC system. Over time, both testing methods and the technologies under evaluation have evolved. For example, the introduction of Air Source Heat Pumps (ASHPs) has created new requirements for humidity control. The majority of work performed at Energy House 1 involves replicating outside temperature experienced during the UK heating season (-5 °C to +15 °C). Clients also express interest in performing research in extreme winter and summer conditions (-10 °C to +40 °C).

Katy Reed

Published 11 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Marina Inkles

[email protected]

+44 7816481039

Timeline complete

Publish
Bid
Evaluate
Award
Complete