Contract for the Execution of Mynydd Newydd Skatepark Refurbishment

Open

Buyers

Value

£120,000

Classifications

  • Construction work for sports facilities
  • Construction work of leisure facilities

Tags

  • tender

Submission Deadline

3 weeks from now

Published

1 week ago

Description

The Mynydd Newydd Skatepark Refurbishment is part of the third round in a series of skatepark and pumptrack projects to be delivered across the city and county of Swansea. This skatepark within this contract will be complemented by existing facilities and new projects to create a network of skate and wheeled sports facilities of different size, scale and challenge level. Swansea Council has engaged Curve Studio to manage the project on its behalf, and an experienced, qualified contractor will be appointed to engineer proposals and carry out the works on-site.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Yate Outdoor Sports Complex All Weather Pitch & Track Floodlights

Site Address - Yate Outdoor Sport Complex, Broad Lane, Yate, Bristol, BS37 7LB Supply and installation of the full lighting system including removal of all existing floodlights at the All Weather Pitch & Athletics Track, replacement with new. The system is required to meet England Hockey and England Athletics Specification. • Class I hockey - maintained average illumination level of 500 Lux • Class II athletics - maintained average illuminance of 200 lux All works associated with the mechanical and electrical installation to include; • Removal and disposal of Mast 4 (M4) on the All Weather Pitch • Replacement of M4 - To supply and installation of 15m HL250E base hinged mast complete with concrete foundation and foundation kits identified in a structural survey report. • Mast 20 (M20) requires an overlap pot adaptor. The current bracket must be removed, and the mounting plate cut and prepared in accordance with the specifications. • General repainting and corrosion protection measures to all masts. • 52no LED luminaires, new brackets and drivers. • Removal and disposal of the existing HID floodlights. • On completion a satisfactory electrical test and light check to confirm Lux Levels. • A minimum 5 year parts and labour warranty. • Risk Assessments & Method Statements to be included. All Weather Pitch Floodlights (M1 - M8) and Mast 4 replacement to be completed first and preferably by the 1st September 2025. If works are carried out during September, then the engineers are to phase floodlight works so that only one floodlight column at a time shall be out of commission to ensure the sporting complex is still able to use the remaining floodlights for training. Athletics Track Floodlights (M9 - M20) to be completed by 30th September with engineers to phase floodlight works so that only one floodlight column at a time shall be out of commission to ensure the sporting complex is still able to use the remaining floodlights for training. The successful tender will be required to enter a JCT Design and Build form of contract with the client: Yate Town Council. Retention percentage 5% reducing to 2.5% on practical completion Valuations will be monthly. Should the works be completed in less than a month, payment will be made on receipt of invoice. 30 day payment terms.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete