MUGA AGA

Award

Value

£250,000

Suppliers

Classifications

  • Recreational, cultural and sporting services

Tags

  • award

Submission Deadline

5 months ago

Published

4 months ago

Description

This Further Competition (FC) is being issued by Abbey Multi Academy Trust to procure the installation of a Multi Use Games Area via the DPS for the provision of goods and services to drive social impact and improvement.

The Academy currently has a tarmac surface area used for tennis, football, etc (see Appendix H1. Existing Area). They would like to replace this surface with a Multi Use Games Area, and have selected to use the project "Playrite - Tournament MF" (see Appendix H3. Product Specification - Playrite Tournament MF).

The contractor must be an approved installer registered with Playrite.

The existing pitch is circa 72m x 36m, and so the project will see the pitch widen by 2 metres and add a new fence-line to the extended section. The installed pitch will be a minimum of 72m x 38m (see Appendix H2. Proposed Plan).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Zoe Court

[email protected]

07741 404863

Timeline complete

Publish
Bid
Evaluate
Award
Complete