Jubilee Vehicle Underframe Modification (JVUM) Lot 2 Drawgear modification - concept- design - prototype

Open

Buyers

Value

£2,000,000

Classifications

  • Railway maintenance or service vehicles, and railway freight wagons
  • Railway transport services

Tags

  • tender

Submission Deadline

5 months from now

Published

2 days ago

Description

The scope of the Specification includes the design, prototyping and testing of the Modified Drawgear at all intermediate positions on the 1996 Tube Stock (96TS) vehicles.
The scope  requirements for the design, prototyping and testing of a Modified Drawgear for the London Underground (LU) 1996 Tube Stock (96TS) are to address the known deficiencies of the existing system. This project is known as Jubilee Vehicle 
Underframe Modification (JVUM) Project Lot 2.
The Designer is required to design, supply and test prototypes for the Modified Drawgear at the intermediate vehicle positions of the 96TS. 
The Modified Drawgear shall feature a Collapse Element to replace the failing Jaw Release Mechanism,
As the Jaw Release Mechanism is complex and bespoke, collapse solutions of proven technology used in the railway industry are preferred. 
The Modified Drawgear shall have a design life of not less than 25 years.
The Designer is required to  deliver prototypes of the Modified Drawgear for testing.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete