Remedial Works to Retaining Wall at Saxon Hall, Raunds - Design and Construction of Micropile Anchoring System

Open

Buyers

Value

£15,000

Classifications

  • Engineering works and construction works
  • Masonry and bricklaying work
  • Environmental improvement works
  • Geotechnical engineering services

Tags

  • tenderUpdate

Submission Deadline

1 month from now

Published

3 days ago

Description

Raunds Town Council is seeking a suitably experienced contractor to undertake remedial works to a distressed retaining wall at Saxon Hall. The works will include vegetation removal, installation and testing of R32 self-drilling micropiles, masonry repairs, and reinstatement. This is a design-and-construct contract based on a geotechnical design report and structural inspection findings. Submit tenders by 12:00 noon on 28 July 2025 to: Town Clerk, Raunds Town Council The Hall, Thorpe Street, Raunds, NN9 6LT Email: [email protected] Subject: Tender Submission - Saxon Hall Retaining Wall

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Flood Cell 06, Snape Maltings

The Upper Alde & Ore Estuary Embankment Improvements scheme will reduce tidal flood riskand enhance the environment in the Upper Alde and Ore Estuary. The Alde and Ore Estuary is vulnerable to flooding from the sea made worse by the poor condition of many of the flood defences. The proposed Flood Cell 06, Snape Maltings scheme is 1 of 4 cells identified to improve the Standard of Service of the existing flood defences and provide resilience to withstand 300mm of overtopping from a 1:200+ year event, given predicted sea levels in 2050. The Client is theEast Suffolk Water Management Board. In summary, the scope of Works for the project includes civil engineering works (but is not limited to):  Establish main site offices, compound, temporary services and access routes.  Alliance House - Installation of approximately 20m of new demountable defences along the quay side with piled and concrete slab foundation;  River Alde Quay - Installation of approximately 120m of new demountable defences along the northern quay side with piled and concrete slab foundation;  Henry Moore Lawn - Improvement to approximately 80metres of earth flood embankment to be constructed in a passive fashion to provide improved flood protection and amenity and access value around the Henry Moore Lawn area terminating at the northeastern edge of the Concert Hall building; and  Terrace Car Park - Improvement to approximately 100metres of earth flood embankment, incorporating pedestrian access provision, constructed from the River Cafe terrace area, terminating into the southeast car park area. The works are estimated to cost around £2.3million. The form of contract will be a NEC4 ECC Option A. All tender documents are available through the Client or the Client's appointed tender and contract manager Stantec UK Ltd.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete