Electrical Rewire Project

Complete

Buyers

Value

£2,112,000

Classifications

  • Electrical wiring and fitting work
  • Electrical installation work
  • Electrical wiring work
  • Electrical fitting work
  • Other electrical installation work
  • Electrical services

Tags

  • tender

Submission Deadline

4 weeks ago

Published

1 month ago

Description

To upgrade the electrical fixed wiring within the property for safety of continued use, and to rectify any non-compliances with the current BS 7671 regulations. Fixed electrical equipment is to be also verified as fit for purpose and safe for continued use, upgrade all older wiring and accessories on the (red/black colours).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Electrical and Mechanical Servicing for all Hot Water & Heating Service Assets & Associated Plant

Norfolk County Council (NCC) is seeking proposals from qualified providers to deliver comprehensive compliance inspections and certification for our hot water service assets and associated Plant. This tender covers a wide range of systems, including gas boilers, oil boilers, biofuel boilers, unvented/vented water heaters, standard electrical water heaters, as well as air source and ground source heat pump systems. Our assets range from domestic systems to large commercial Boilers and associated plant. The successful provider will be expected to ensure that all systems are tested, certified, and reported in line with current regulatory standards. Our aim is to guarantee safe and efficient operation of these critical assets across the Council's portfolio. Please note that the values in this notice are an indication for the full 5 year term of the contract including extension Options. Please note that Norfolk County Council has joined the government's Devolution Priority Programme. This process has the potential to lead to the establishment of a county combined authority for Norfolk and Suffolk, with strategic powers, headed by an elected mayor. A Government has also invited participation by Norfolk in Local Government Review. This process has the potential to lead to unitary local government in Norfolk, being either one unitary or more than one. One of these changes could happen without the other.

Katy Reed

Published 18 hours ago
Open

Provision of Christmas Lights Display Services for Raunds Town Council (Contract Term: 2026-2028 or 2026-2030)

Raunds Town Council is procuring a contract for the design, supply (including rental where applicable), installation, in-season maintenance, removal, and storage of festive Christmas lighting displays across various public spaces in the town centre. The contractor will be responsible for delivering the full lifecycle of Christmas lighting services annually, over either a three-year term (2026-2028) or a five-year term (2026-2030). Tenderers are required to submit proposals and pricing for both durations. The required services include but are not limited to: Supply and rental of lighting displays for 16 lamp columns, including 12 single units, 2 double units, and 1 feature display. Installation and takedown of both Council-owned and contractor-supplied lighting. Attendance by a two-person team at the annual Christmas Lights Switch-On event (last Sunday in November). Annual PAT testing and safety checks of all lighting equipment. Annual load testing of four anchor bolts for cross-street/catenary installations. In-season maintenance, including emergency repairs within 24 hours and standard issue resolution within 36 hours. Secure, insured storage of Council-owned equipment between seasons. Full compliance with BS 7671 electrical wiring regulations and applicable health and safety legislation. Coordination with Council officers to ensure design quality, visual impact, and energy efficiency. Testing of lights on the day of the Switch-On event and provision of estimated electricity consumption data where required. Installations must begin after Armistice Day (12 November) and be fully operational at least 14 days before the Switch-On event. All lighting must be switched off by 6 January and removed by 18 January each year. The contractor must demonstrate relevant experience, hold the required levels of public liability (£10m), employer's liability (£10m), and professional indemnity insurance (£2m), and attend a mandatory site visit before submission. This procurement will be conducted under the open procedure. Evaluation will be based on both cost and quality criteria.

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete