CA16012 - Groundworks Services Framework

Open

Buyers

Value

£0

Classifications

  • Site preparation work

Tags

  • tender

Submission Deadline

1 month from now

Published

20 hours ago

Description

The purpose of this invitation to tender is for Karbon Homes the Authority to appoint an experienced and competent Contractors to deliver Groundworks Services across the Northeast & Yorkshire.

Includes Lots: 
Lot 1: Groundworks North
Lot 2: Groundworks South 
Lot 3: Groundworks 54N East
Lot 4: Groundworks 54N West 

To access this competition: 

Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA16012.

Not registered:
Visit https://suppliers.multiquote.com then register and quote CA16012 as the reason for registration. 

 Any queries please contact MultiQuote on 0151 482 9230.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Oldfield Road - Design and Install Temporary Compound and Scaffold Lighting

This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge. At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station. There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation. The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete