Water Hygiene Management Corporate

Open

Buyers

Value

£80,000

Classifications

  • Water-treatment work
  • Environmental services
  • Services related to water pollution

Tags

  • tender

Submission Deadline

3 weeks from now

Published

1 day ago

Description

Provision of Water Hygiene Management services 2 Lots

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

UKHab Survey & Natural Capital Assessment of NHS Estate

NatureScot, in partnership with NHS National Services Scotland, is intending to carry out: 1. a UKHabv2 survey and; 2. a Natural Capital Assessment (NCA) of the NHS Estate in Scotland. A first Phase (herein referred to as Phase A to avoid confusion with ‘Phase 1’ Surveys) has already delivered UKHabv2 surveys for the NHS Estate within areas covered by NHS Greater Glasgow and Clyde, NHS Highland and NHS Tayside. Additionally, a Phase 1 Habitat Survey of NHS Lothian Estate was carried out in 2020 as part of a biodiversity and climate change assessment for the NHS Lothian estate. 1. The purpose of carrying out the UKHAb2 survey in the remaining 10 NHS Board areas (Phase B) is to establish a baseline to inform: - a natural capital account of NHS greenspace at the NHS Board scale (part 2. of this project) - a possible future biodiversity assessment of the NHS Estate, once an biodiversity metric tool has been developed and established in Scotland - management of NHS greenspace to provide positive effects for biodiversity - management of NHS greenspace to maximize the health benefits for staff, patients and the wider community - priorities for investment in NHS greenspace to maximize benefits for people and nature - opportunities for people to connect with nature as part of therapeutic health interventions 2. The purpose of carrying out the NCA across all Board areas (Phases A and B) is to provide: - an appreciation and valuation – where possible in monetary terms - of the ecosystem services that the natural resources provide, such as clean water and air, flood regulation, climate regulation (carbon sequestration), pollination and visual amenity - a framework for understanding the economic and social value of natural assets, which can be used to justify investments in nature and guide resource allocation - a demonstration of how the NHS contributes to the well-being of society through actions that benefit nature - a framework for risk management of natural capital and the potential impacts on the NHS estate.

Open

Riparian Buffer Strip Tool and Methodology for project assessments

Natural England is developing the Conservation Measures Standard to underpin the delivery of the NRF. Part of this work requires a methodology and tool for quantify the nutrient reductions generated through implementing riparian buffer strips (RBS) in Nutrient Neutrality (NN) catchments to improve water quality. This tool will facilitate mitigation scheme suppliers to design and deliver robust RBS to generate nutrient reductions capable of offsetting nutrient inputs from development in NN catchments. This tool and its associated guidance will be part of a wider project Natural England has begun to produce standardised tools, guidance and assessment criteria to ensure conservation measure projects (mitigation schemes) are effective at achieving the intended environmental outcome. This project, the Conservation Measures Standard (CMS), will develop Solution Toolkits for each of the measure relied upon to deliver nutrient mitigation, prioritising the most effective and commonly used measures to allow scheme suppliers to design and implement high-quality schemes in accordance with the set standard. This request for work will build on existing work on RBS to generate nutrient mitigation by commissioning a comprehensive methodology and tool to accurately quantify the nutrient reduction achieved at a project scale through the implementation of RBS. The commission forms two parts, the first request is to design a robust methodology to calculate the N and P reduction achieved in kg/year by implementing a RBS project in a NN catchment. This will need to be developed in collaboration with NE and should incorporate the existing evidence base commissioned by NE. The second part of this commission is to use GIS and data science/analytics to develop a tool to enable site specific calculations for N and P reductions achieved by a RBS project. This must be based on the above methodology and should incorporate a level of precaution to account for any uncertainty. The work should align with other publications and tools generated by NE to quantify the nutrient inputs resulting from new development (Nutrient Neutrality calculators) and to quantify the nutrient reductions achieved by Nature-based Solutions/mitigation measures (Cover Crop calculators).

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete