Provision of Repairs to Quay Walls and Infrastructure at Newport Harbour (Isle of Wight) - Phase Two

Open

Buyers

Value

£500,000

Classifications

  • Construction work
  • Construction structures and materials; auxiliary products to construction (except electric apparatus)

Tags

  • tender

Submission Deadline

3 weeks from now

Published

2 days ago

Description

A survey of the harbour walls which are in the Authority's ownership was commissioned in March 2014 to ascertain the condition of the walls and the level of works required to ensure that they are safe and fit for purpose. The first phase of works was completed in late 2019/early 2020. The Authority has now allocated further capital funding to undertake the second phase of repairs to the walls and harbour infrastructure; the sections requiring attention are detailed on the plans in the tender appendices.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Marine Lake Project, Weston-super-Mare

North Somerset Council require a contractor for the Marine Lake project in Weston-super-Mare. The Marine Lake project aims to enhance the existing facilities at Weston-super-Mare's Marine Lake. The primary goal is to create a safe swimming facility that complements Weston-super-Mare's coastal economy, providing resilience against tidal variance. The project seeks to improve the area's usability, attractiveness, and general facilities for the public. The scope of works are for architectural renovations and civil / structural works, which include: • Slipway works • Resurfacing of walkway • WC refurbishment • Creation of concession space • Welcome signs • Madeira Gardens roof repairs • Ramp repairs, repair and resurface steps • No Diving signage to walkway Provisional Items: • Cycle racks The project will be managed under JCT Intermediate Building Contract with Contractors Design, with an estimated contract duration of 84 weeks including a defects period. Tender documents can be found and downloaded from the Supplying the South West portal: https://procontract.due-north.com/Advert?advertId=7a7eb423-b73f-f011-8136-005056b64545&p=696a9836-1895-e511-8105-000c29c9ba21 SITE VISIT: North Somerset Council are offering contractors the opportunity for an accompanied site visit on Tuesday 24 June 2025. Time slots are available on a first-come-first-served basis and must be booked in advance. Please refer to the Site Visit details in the 'Invitation to Tender Information and Instructions' document on the Supplying the South West portal for instructions if you would like to attend.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete