Roads and Streetlighting Maintenance Framework 2025-2029

Award

Similar Contracts

Open

Highways Framework

Blackpool Council are establishing a lotted - Highways surfacing and civil engineering works Framework. The procurement will be conducted as an open tender and will establish a framework for a 4-year period. Call off contracts may be entered into from the framework in the manner described within the tender documents. The framework will consist of two lots as follows: Lot 1 – Highways Surfacing - Surfacing includes re-surfacing and re-construction of the highway network using conventional surfacing materials consisting of flexible and rigid pavement treatments (hot, warm and cold mix asphalts/concrete) Lot 2 – Highways Civils - Civil Engineering Works includes construction of improvement works on or associated with the highway network The intention is to establish a framework of up to 4 Suppliers for lot 1 and up to 4 Suppliers for lot 2. The indicative range of call off contracts that may be entered into is typically expected to be in the range as set out below: • Lot 1 – Highways Surfacing - £100,000 - £5,000,000 • Lot 2 – Highways Civils - £100,000 - £1,500,000 In addition to Blackpool Council the framework is being made available to Lancashire County Council, Blackburn with Darwen Council, Lancashire Combined County Authority, Current members, associate members and future members of the Association of Greater Manchester Authorities. The published tender documents set out full details of the procurement process. All tender documents are available free of charge through Blackpool Council's e-tendering portal - https://procontract.due-north.com/

Katy Reed

Published 1 day ago
Open

DfI TRAM Road Asset Management - Surface Dressing Framework

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing. The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works. The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k. Area Lots are: SDF S2 - Newry, Mourne and Down / Ards and North Down; SDF W2 - Derry and Strabane / Fermanagh and Omagh; SDF S1 - Armagh, Banbridge and Craigavon; SDF W1 - Mid Ulster; SDF N1 - Causeway Coast and Glens; SDF N2 - Mid and East Antrim / Antrim and Newtownabbey; SDF E1 - Belfast / Lisburn and Castlereagh. Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).

Katy Reed

Published 3 weeks ago
Open

DfI TRAM Road Asset Management - Surface Dressing Framework

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. The Department for Infrastructure – Transport and Road Asset Management (TRAM) intends to establish a multi-contractor, multi-lot framework, for the delivery of Surface Dressing. The Framework will include the following work activities: application of surface dressing, associated road markings, delivery of temporary traffic management as part of associated civils works on live trafficked public roads, and other associated ancillary works. The Framework will comprise of seven Area Lots (1-7). A Measured Term Contract (MTC) Call-Off will be awarded for each Area Lot as listed below. Each MTC will deliver surface dressing works commissioned through Works Orders, each with a value of up to £750k. Area Lots are: SDF S2 - Newry, Mourne and Down / Ards and North Down; SDF W2 - Derry and Strabane / Fermanagh and Omagh; SDF S1 - Armagh, Banbridge and Craigavon; SDF W1 - Mid Ulster; SDF N1 - Causeway Coast and Glens; SDF N2 - Mid and East Antrim / Antrim and Newtownabbey; SDF E1 - Belfast / Lisburn and Castlereagh. Framework award is expected to be in April 2026. However, works under the MTC Call-Off Contracts are not anticipated to commence until the 2027 Surface Dressing season, likely to commence in May 2027. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £80m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £100m (ex VAT).

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

[email protected]

+44 1851600501

+44 1851706632

+44 7769712170

Timeline complete

Publish
Bid
Evaluate
Award
Complete