Coed-y-Brain Primary School - New Roof
Buyers
Value
£70,000
Classifications
- Roof works and other special trade construction works
- Building construction work
Tags
- tender
Submission Deadline
2 weeks from now
Published
2 days ago
Description
You are invited to submit a tender to provide a new roof covering and associated works at Coed Y Brain Primary School. The scope of the project is fully described in this ITT but in summary the scope is: - Provide and erect fixed scaffolding with built in stairs, hoists for materials, and including additional protection over all maintained entrance/exit and fire escape doors, double boarded fans, kick boards, brick guards on handrails, netting and any post protection padding as may be necessary, etc. - Allow for all necessary protection to the existing outdoor play areas. - Heras anti climb fencing to be erected around the complete perimeter of the scaffolding, a minimum 1-2m outside the base of scaffolding, to provide complete segregation between the works and school users. - Protected walkways to be provided at all entry points to the school - No Doorways, gates or walkways are to be blocked off during the execution of these works without the prior written consent of the contract administrator. - To the areas noted on drawing provide and fit new Redland tiles in accordance with manufacturers recommendations and specification including all new lead gutters, valleys, flashings, breathable under cloak, and all necessary ventilation. - All to be as the attached BMI Redland specification. The existing insulation to be checked and increased to 300mm. - Lead to Gutters and Valleys to be Code 5 with Code 4 everywhere else - Take down and dispose of all gutters, downpipes, etc. Replace with Alumasc, Heritage, Beaded, Deep Run gutter, square downpipes, brackets, etc., Colour to be Black. Gutter brackets fixed at a maximum 1.00m centres. Provide and fix to existing timbers all new PVC capping, fascia and barge boards, colour to be black. - Engage with and manage any asbestos removals by an Asbestos Removals Contractor from the CCBC Framework for Asbestos Removals on site. You will coordinate and manage their workload on site liaising with their specialist team and asbestos officers from Caerphilly County Borough council to ensure all asbestos is removed from work areas before any other works are carried out. - NB the roof replacement will be carried out during Summer Holidays 2025 Key Dates: Construction Start: 30 June 2025 Construction period: 8 weeks
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Organisation
Timeline active
Evaluate
Award
Complete