Design and Build Bow Door Lifting Replacement for Landing Craft Tank- LCT 7074

Open

Buyers

Value

£30,000

Classifications

  • Engineering works and construction works

Tags

  • tender

Submission Deadline

2 weeks from now

Published

3 days ago

Description

The National Museum of the Royal Navy (NMRN) are seeking to appoint a contractor to design, build and install replacement bow door lifting arrangements onto Landing Craft Tank- LCT 7074 situated at the D-Day Story, Southsea, UK. 
LCT 7074 is owned as part of the NMRN Historic Ships fleet, it is operated by the D-Day Story as a visitor attraction. The replacement bow door lifting arrangements is to ensure the continued operation of the landing craft all year and to reduce the current maintenance cost of the current installed arrangement.
The intention is for works to be undertaken during the off-peak season between November 2024- March 2026. With requirement for Heritage Impact Assessment to be undertaken and approved by NMRN and associated stakeholders before fabrication and installation is made.
Site visits are strongly advised for this tender to see the current arrangement, and also to survey the landing crafts port and starboard arms where lifting arrangements are to be installed.
There are additional documentation including photographs and drawings to interested bidders- expression of interest must be sent to [email protected] to receive this.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Borehole Framework

All details presented here are estimates and subject to change prior to launch. This is an advance notice and not a call to Tender at this time. The Mining Remediation Authorities mine water monitoring network provides insights into legacy mining risks and opportunities, including: Aquifer protection Environmental protection from interactions between mine water and surface or underground water Subsidence risks Mine gas migration Opportunities for mine water heat use Mine water heat licensing and assurance Future emerging opportunities and risks Boreholes form part of our groundwater and mine water monitoring network and are critical in the assessment and management of legacy mining risks. Our monitoring allows us to identify, assess and quantify risks and to develop interventions that protect water resources and the natural environment. As a secondary benefit, we can also monitor the mine water heat at these points and add this to our heat map portfolio for future potential opportunities in this area. Over the coming years the Mining Remediation Authority will drill boreholes across the UK to support the remediation and management of rising and recovered mine water in underground coal workings. Boreholes and pumping tests are required to allow monitoring and mine water control. The activities are time critical to allow mitigations to be implemented before impacts occur, preventing pollution incidents. Our boreholes support: targeting deep underground mine workings the assessment of water levels and chemistry being a key component of our monitoring network filling in knowledge gaps in areas where mineshafts and other monitoring options have been decommissioned or abandoned assessing underground water systems, their behaviours, relationships, and to develop and operate effective management interventions. Borehole testing enhances: our understanding of system characteristics information on the extent of influence the assessment of the likely effectiveness or suitability of proposed management; and the long-term management through abstraction of mine water The Mining Remediation Authority is intending to come to market in Summer 2025 to seek suitably qualified Contractors who can aid in the delivery of our expanding Borehole programme. We have identified the work streams we require and these are represented by the five Lots detailed further in this notice. Our intention being to maximise value for money as well as providing opportunity to as many SME as possible.

Katy Reed

Published 8 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete