Thanet District Council Brunswick Court Replacement of Fire Door Sets

Award

Value

£200,000

Classifications

  • Installation of doors
  • Construction work
  • Repair and maintenance services
  • Installation services of fire protection equipment
  • Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry
  • Repair and maintenance of public conveniences
  • Installation services of mechanical equipment
  • Construction work for water projects
  • Roof works and other special trade construction works
  • Repair and maintenance services of central heating
  • Installation services of electrical equipment
  • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants

Tags

  • award
  • contract

Published

6 months ago

Description

The South East Consortium on behalf of Thanet District Council invites you to tender for their block 1-41 Brunswick Court to replace the Fire Door Sets.
To undertake the replacement of existing composite and timber fire doorsets. To be carried out on a planned basis to a single block of flats with communal/storage areas at Brunswick Court, Ramsgate, and consisting of: front doors, service cupboard doors, store doors, shed doors and communal lobby doors. In addition, the contract will be to replace meter over cover boxes, and any associated works; asbestos sampling/removal and general repairs.

Similar Contracts

Open

HVAC at Energy House 1

1.1.1 The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2 The University operates two unique research facilities: Energy House 1 and Energy House 2.0. Both facilities contain environmental climate chambers that house test buildings. Energy House 1, located in the Cockcroft building, features a Victorian End Terrace House and was the first of its kind when constructed. The chamber enables the simulation of a wide range of European weather conditions, allowing for the testing of construction products and heating systems under controlled conditions environments. The environmental chamber has a dedicated heating and ventilation and air conditioning (HVAC) system. 1.1.3 After more than 10 year in operation, Energy House 1 is experiencing maintenance and performance issues with its existing HVAC system. Over time, both testing methods and the technologies under evaluation have evolved. For example, the introduction of Air Source Heat Pumps (ASHPs) has created new requirements for humidity control. The majority of work performed at Energy House 1 involves replicating outside temperature experienced during the UK heating season (-5 °C to +15 °C). Clients also express interest in performing research in extreme winter and summer conditions (-10 °C to +40 °C).

Katy Reed

Published 12 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mr Christopher Hughes

[email protected]

+44 2045706637

Timeline complete

Publish
Bid
Evaluate
Award
Complete