Cassiltoun HA Window & Door Replacements 2025

Complete

Value

£0

Classifications

  • Installation of doors and windows and related components
  • Installation of doors
  • Fire doors
  • Installation of doors and windows

Tags

  • tender

Submission Deadline

4 months ago

Published

5 months ago

Description

The successful Candidate will be responsible for the supply and installation of replacement ‘outward opening, fully reversible’ [and/ or ‘tilt & turn’] uPVC windows & composite/ fire doors and all associated works/ alterations within occupied flats/ houses at Various Addresses, Castlemilk G45.
The initial contract period will be to 31st March 2026, with options to extend the contract solely at the Employer’s discretion on an annual basis thereafter to 31st August 2030.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

External & Communal Pre Construction Services and Works to Houses Framework  CRN00039877

External & Communal Pre Construction Services and Works to Houses Framework Multiple Supplier Framework (of up to three contractors per Lot) to undertake various services and works related to improvement and planned maintenance works, by means of Pre-construction Services Call-offs and Works Call-offs. This Framework is to be split into 3no Lots as follows: LOT 1, Pre-Construction Services and External works, to low rise properties LOT 2, Pre-Construction Services and External works, to high rise properties LOT 3, Pre-Construction Services and Communal works, to low rise and high rise properties The following descriptions are indicative of the types of services and works that may be commissioned under each Lot. In addition, other similar services and works may also be commissioned. Bidders should note that the estimated value below consists of the provisional budget allocated within the capital plan for all contractors. The actual value per contractor will be expected to be a much smaller proportion following distribution of work amongst an anticipated 3no framework contractors per lot. Work and budgets per contractor will also be affected by work carried out by direct in-house resources, contingency allowances, non-access to properties, efficiency savings, and subject to regular reviews and re-allocations of priorities by the Council. The non-binding target is that each framework contractor would receive approximately: Lot1 GBP2-4Million of work turnover per year; Lot2 GBP1-2Million of work turnover per year; Lot3 GBP0.3-1Million of work turnover per year; The framework contractors will also be required to perform to the council's key performance indicator targets, and community benefits expectations (described elsewhere) Types of work that may be awarded to framework contractors, but is non-binding, is detailed below: LOT 1 Pre-Construction Services and External works, to low rise properties Repairs and/or installation of: external masonry, concrete and joinery flat and pitched roof coverings, external and cavity wall insulation, and related works Door/window/screen replacements Photo voltaic panels and/or air source heat pumps Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Utility company coordination so as to reposition and/or replace gas pipework, meters etc Any other relevant services or works LOT 2 Pre-Construction Services and External works, to high rise properties Repairs and/or installation of: external masonry, concrete and joinery flat roof coverings external and cavity wall insulation, and related works Door/window/screens Repairs and/or renewing lightning protection and roof ventilation fans Repositioning and/or replacing drainage, rainwater goods, and other services to facilitate external wall insulation/render works Any other relevant services or works LOT 3 Pre-Construction Services and Communal works, to low rise and high rise properties Repairs and/or installation of: Communal door/window/screens Foyer/communal hall/stair upgrading Firestopping, smoke control ventilation Below and above ground drainage lightning protection and mechanical ventilation door entry systems and communal lighting electrical switchgear, distribution and containment fire/smoke detection fire alarms fire suppression systems Communal potable water tank replacements Communal space heating replacements Communal hot & cold water services replacements Automatic Controls for communal mechanical and electrical services Fire Panel Controls for communal fire protection Lift replacements Any other relevant services or works

Open

IMO Fire Door Works - Phase 1 Riser Doors

Fire Door Remedial Works – Phase 1 The works are summarised as follows: • Fire door repairs (30 doors) • Fire door replacements (61 doors) • Fire door survey of the doors within the scope of works • Associated making good around fire doors • Certification of all associated works in accordance with the employer’s requirements. The proposed works areas are stair cores and risers (Core A, B and C) The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: • All repairs and replacement of fire doors The contractor is independently responsible for assessing the condition of all fire doors within the scope and ensuring that all works are completed in accordance with relevant standards and certification requirements. The provisional timetable for this procurement is: w/c 27 October - tender goes live w/c 3 November – Site Visits (No site visits permitted between 19 November – 4 December) 19 November - Deadline for clarification questions from tenderers Noon 24 November - Deadline for tender responses 24 November – 2 January - Evaluation of tenders w/c 5 January 2026 - DfT Issue of intention to award w/c 12 January 2026 - Contract Award March – May 2026 – Works on site, London If you are interested in this opportunity: 1. Register for a Jaggaer account: https://dft.app.jaggaer.com/web/login.html 2. Once you have a Jaggaer account, click through to: itt_2855 - IMO Fire Door Works - Phase 1 3. Book a site visit at the IMO, 4 Albert Embankment, SE1 7SR by emailing [email protected] cc [email protected] and [email protected] - please indicate dates and two hour slots in which you will be available to attend. 4. With the exception of arranging site visits, please use the messaging function on the Jaggaer Portal for all other queries. Please note that the Portal sends automated notifications to alert suppliers of new messages. These will come from [email protected] and may appear in your Junk folder. Tenderers are requested to provide a schedule of rates for repairs and door replacements. Should investigations find that door sets require further repairs or full replacement to achieve compliance (beyond the specification), these rates will be used for the additional works. The contract value is an estimate amount for the works specified in the ITT + contingency for additional works that might be required. The Department is in the process of replacing fire doors within the IMO Building and intends to carry out a subsequent procurement of similar goods, services or works for future phases of the upgrade programme.

Katy Reed

Published 4 days ago
Open

IMO Fire Door Works - Phase 1 Riser Doors

Fire Door Remedial Works – Phase 1 The works are summarised as follows: • Fire door repairs (30 doors) • Fire door replacements (61 doors) • Fire door survey of the doors within the scope of works • Associated making good around fire doors • Certification of all associated works in accordance with the employer’s requirements. The proposed works areas are stair cores and risers (Core A, B and C) The outline scope of works following the above contractors design portion shall comprise, but is not limited to, the following: • All repairs and replacement of fire doors The contractor is independently responsible for assessing the condition of all fire doors within the scope and ensuring that all works are completed in accordance with relevant standards and certification requirements. The provisional timetable for this procurement is: w/c 27 October - tender goes live w/c 3 November – Site Visits (No site visits permitted between 19 November – 4 December) 19 November - Deadline for clarification questions from tenderers Noon 24 November - Deadline for tender responses 24 November – 2 January - Evaluation of tenders w/c 5 January 2026 - DfT Issue of intention to award w/c 12 January 2026 - Contract Award March – May 2026 – Works on site, London If you are interested in this opportunity: 1. Register for a Jaggaer account: https://dft.app.jaggaer.com/web/login.html 2. Once you have a Jaggaer account, click through to: itt_2855 - IMO Fire Door Works - Phase 1 3. Book a site visit at the IMO, 4 Albert Embankment, SE1 7SR by emailing [email protected] cc [email protected] and [email protected] - please indicate dates and two hour slots in which you will be available to attend. 4. With the exception of arranging site visits, please use the messaging function on the Jaggaer Portal for all other queries. Please note that the Portal sends automated notifications to alert suppliers of new messages. These will come from [email protected] and may appear in your Junk folder. Tenderers are requested to provide a schedule of rates for repairs and door replacements. Should investigations find that door sets require further repairs or full replacement to achieve compliance (beyond the specification), these rates will be used for the additional works. The Department is in the process of replacing fire doors within the IMO Building and intends to carry out a subsequent procurement of similar goods, services or works for future phases of the upgrade programme.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete