North Acton to Hanger Lane Cutting Remedial Work

Open

Buyers

Value

£20,000,000

Classifications

  • Works for complete or part construction and civil engineering work

Tags

  • tenderUpdate

Submission Deadline

2 months from now

Published

6 hours ago

Description

Transport for London (TfL) has identified that cuttings CTS 7 and CTS 8 between North Acton and Hanger Lane require remedial works to stabilise the cutting.
The combined length of the cuttings is approximately 1100m.
The assets are susceptible to pore pressure levels (the pressure of groundwater in the soil or rock) and displacements and are considered a high risk.
Due to the increased number of prolonged rainfall events over the recent years, soil pore pressure build up has become more common and the asset is at greater risk of failure.
In 2017, TfL Engineering produced a detailed design for remediating the asset which consisted of;
Discrete Bored Piles
Discrete H-Piles
King Post Wall
Asset drainage
Re-grading
After the detailed design was completed, the business decision was to pause the project due to funding constraints faced by the business.
Due to the criticality of this asset and the continued deterioration of the cutting, the project has been reinitiated.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete