North View HA Gas Maintenance 2025

Award

Value

£83,724

Suppliers

Classifications

  • Gas appliance maintenance services
  • Repair and maintenance services of boilers
  • Central-heating installation work
  • Boiler installation work

Tags

  • award
  • contract

Published

3 months ago

Description

The work to be undertaken (hereinafter referred to as the Works) comprises the provision of a term maintenance contract for an all-inclusive comprehensive annual inspection, servicing & maintenance contract [with provisional associated replacement works, including boilers, CH systems, detectors and associated works] to approximately 616 [613 domestic tenanted, 2 office and 1 office/ store ] gas central heating installations covering all parts, labour and certification to maintain fully functioning gas fired hot water & heating systems as categorised under the Right to Repair Statutory Scheme in the Employer’s tenanted flats/ houses (which quantity may vary from time to time) in Castlemilk, Glasgow G45 as detailed in Schedule 1 which is the Contract Area

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5471 – Bedwas High School, Boiler Replacement

Caerphilly CBC are inviting contractors to submit a tender for the replacement of the main boilers serving blocks A+B at Bedwas High School, Newport Road, Bedwas, Caerphilly. The scope of the project is fully described in the ITT. In summary the scope is: The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period Carefully survey all services in the existing plant rooms and remove all redundant mechanical and electrical services including any brackets and containment and all redundant plant bases. The contractor shall form new openings in the outside wall to install new weather louvres at high and low level. The contractor shall adapt and make good the plant bases which are to be re-used. The contractor shall install and set to work all new plant and controls generally as shown on the tender drawing. All new and existing services within the boiler room are to insulated as specified. The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certificate them. Employ specialist commissioning engineers to hydraulically balance all system and sub circuits, and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. The timescale for the work is 6 weeks from commencement of the contract. Contractors shall note that the work may continue into the school term time when pupils will be on-site and must make all allowances for segregating and securing the works area. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 6-week period given. Full details are provided in the ITT on Proactis Plaza

Katy Reed

Published 3 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete