HE0914 A350 Chippenham Duelling Scheme April 2023

Award

Value

£25,000,000

Classifications

  • Construction work for highways, roads

Tags

  • award

Submission Deadline

2 years ago

Published

3 months ago

Description

The A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster.\r
It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass.\r
Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids.\r
Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham.\r
In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022.\r
Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025.\r
The scheme is likely to include for the following key elements\r
 Phase 4 dualling, widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway.\r
Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass.\r
Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and\r
Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works.\r
The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Minor and Major Highways Works Framework

This is notification of an upcoming opportunity, in which Slough Borough Council intends to undertake a procurement exercise aimed at setting up a Framework to procure the services of contractors to undertake emergency maintenance, site investigations, minor & major highways and transport works It is anticipated that framework will comprise of 5 lots as follows ( which are subject to change before tender is issue) 1) Lot 1 - Minor Works Construction Project - value range £500,000.00 per contract 2) Lot 2 - Minor Works Construction Projects - value ranges £500,000.00 to £2,000,000.00 per contract 3) Lot 3 - Major Construction Projects - value ranges £2,000,000.00 to £10,000,000.00 per contract 4) Lot 4 - Re-active maintenance works up to the value of £100,000.00 per contract 5) Lot 5 - Carriageway Resurfacing Works up to the value of £1,000,000.00 per contract Each lot will list a number of contractors whose services are to be procured to deliver these works via mini competitions or Direct Awards, and call off contracts are to be awarded using Engineering Construction Contracts (ECC) NEC4 Option A or B Contract duration will be for a period of 3 years, with option to extend it for a further 2 year, on an annual basis of 1 + 1 Indicative Procurement Timelines are Issue of Tender Documents & Tender Notice - w/c 7 July 2025 Tender Return - End of August 2025 Tender Evaluation - September to December 2025 Internal Governance/Statutory Approvals – January/March 2026 Anticipated Contract Award Notice – April / May 2026

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete