HE0914 A350 Chippenham Duelling Scheme April 2023

Award

Value

£21,191,000,000

Classifications

  • Construction work for highways, roads
  • Road construction works
  • Main road construction works
  • Ring road construction work
  • Roundabout construction work
  • Road-surface painting work
  • Dual carriageway construction work
  • Trunk road construction work
  • Surface work for highways
  • Erection of road-barriers
  • Installation of road signs
  • Construction work for highways
  • Installation of street furniture
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for highways

Tags

  • award
  • contract

Published

3 months ago

Description

he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster.
It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass.
Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids.
Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham.
In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022.
Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025.
The scheme is likely to include for the following key elements
Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway.
Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass.
Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and
Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works.
The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works.
The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated.
The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Highways Maintenance Works - Multi-Lot

The Council is seeking to appoint suppliers for Highways Maintenance Works, which is split into two (2) lots, Lot 1 - A1.1 Surface Dressing & Micro Carriageway Surfacing and Lot 2 - A2 Structural Carriageway Resurfacing. The work involved within Lot 1 - A.1.1 will involve carriageway surface dressing which will include post application processes to prevent chipping loss, pre-patching using conventional and specialist materials, and proprietary processes including re-application of carriageway markings, associated ironwork adjustments and renewal, and all associated traffic and pedestrian management; and resurfacing of carriageways using specialist thin-layer micro surfacing materials, including pre-patching using conventional and specialist materials and proprietary processes, and re-application of carriageway markings, associated ironwork adjustments and renewal, and all associated traffic and pedestrian management. A single supplier will be awarded the contract under Lot 1. The work involved within Lot 2 - A2 will involve highway surfacing, including Hot Rolled Asphalt, Close Graded Asphalt Concrete, and other specialist asphalts as necessary, to base, binder, and surface levels, and proprietary processes including ironwork adjustment, re-application of carriageway markings, and all associated traffic and pedestrian management. A single supplier will be awarded the contract under Lot 2. Tenderers can submit a tender response for one or both Lots. The anticipated contract commencement date for both Lots is 1 December 2025 and will be for a period 3 years, to conclude on 1 December 2028.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mr Dave Gillett

[email protected]

+44 1255713371

Timeline complete

Publish
Bid
Evaluate
Award
Complete