Completion works of part-constructed building at Luckwell Road

Award

Value

£10,712,899

Classifications

  • Works for complete or part construction and civil engineering work
  • Construction work for multi-dwelling buildings and individual houses

Tags

  • award
  • contract

Published

2 months ago

Description

The direct award of a JCT 2016 Design and Build Contract to Markey Construction Ltd for the completion of a partly constructed residential affordable housing development following  procurement via the Westworks DPS and subsequent other market engagement failed to procure any interest.   
The development comprises the design and construction of the completion of 67 partially constructed dwellings, along with the strip out of defective works, site clearance of defective materials, associated external works including drainage, service connections and diversions, parking areas, footpaths and landscaping. 
The scheme was originally contracted as a JCT Design and Build Contract in December 2020.  The previous contractor fell into administration in November 2023.  This replacement has been prompted by the insolvency of the previous contractor and the need to complete the housing development in accordance with funding timescales. 
Brighter Places considers the award of a contract without prior publication to be permitted by Part 2 of the Regulations. 
Brighter Places has published this VTN setting out its intention to enter into the contract referred to above. 
Brighter Places will not enter into the contract referred to above before the end of a period of at least ten (10) days beginning with the day after the date on which the VTN was published in the Find a Tender Service.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

IWM/2526/FM/3429: Minor Works Framework for Imperial War Museums

Imperial War Museums (IWM) is seeking to establish a new Minor Works Framework Agreement to support the delivery of planned and reactive minor works across its estate over the next three to four years. Framework Structure: The Framework is divided into two Lots, each covering different geographic areas. Up to four suppliers will be appointed to each Lot. Each Lot will be evaluated independently; appointment to one Lot does not guarantee appointment to another. Lot Details: Lot 1 – Building and Civil Engineering (B&CE) – South-East Covers: IWM London IWM Parkside Office HMS Belfast Churchill War Rooms IWM Duxford (Cambridgeshire) Lot 2 – Building and Civil Engineering (B&CE) – North-West Covers: IWM North (Manchester) Eligibility and Bidding: Bidders may apply for one or both Lots. Those servicing only London and Duxford should apply for Lot 1. Those servicing only Manchester should apply for Lot 2. Bidders wishing to cover all IWM branches must apply for both Lots. Selection Criteria: Suppliers will be selected based on IWM’s confidence in their ability to deliver high-quality services. Evaluation will follow the assessment methodology and award criteria outlined in the tender documents. Objective: IWM seeks experienced and capable suppliers who can offer: High-quality services Competitive pricing Prompt response to the needs of any IWM branch To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=965564869

Katy Reed

Published 2 days ago
Open

Housing Solutions - Supply and installation of Kitchens and Bathrooms

Scope and delivery of the work The work consists of replacement kitchens and bathrooms. A local and professional contractor is needed to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. However, an alternative pricing option is also to be submitted for non-Howdens Kitchens (see Appendix 6 - Commercial Response 1 & 2). We do not have a direct relationship with any kitchen manufacturer and expect you to negotiate your own prices with Howdens and another, being sure to allow for the supply in your basket rates. We assume you will engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works. Note: Two additional weeks have been added to the submission deadline to accommodate the expectation of there being an alternative set of pricing using any other 'non-Howdens' manufacturer for the Kitchens pricing element. No further extensions will be given. Programme scale and duration We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We estimate the value of the contract to be up to £6.5m over the max term of the contract. Geographical distribution Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire. Each year, our programme will consist of approximately 200-500 homes across our estate (depending on each year's agreed budget). Around 70% of our stock are within the Maidenhead area, however as above there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell. Programming We will leave programming of the work to you. We may have a small number of high-priority cases needing to be done earlier, but in general we would give you our address list for each financial year (April to March) and you can determine your own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day. CDM We will appoint the Quoin Consultancy as Principal Designer, you will be appointed Principal Contractor. We assume you will prepare the key documents and Quoin will check them against the regulations. Pricing model Works will be priced on basket rates per the attached specification and pricing matrix with variation on M3NHF SOR Version 7.0. As above, there is also a requirement to put forward an additional 'alternative bid' that features another brand (not Howdens). Pricing: All relevant pricing is to be submitted via the Pricing Matrix (Appendix 6) as all-inclusive (meaning they must include all aspects required to supply and install full kitchens and bathrooms). To ensure a fair and like-for-like comparison; Tender prices are to be offered and agreed on the basis that pricing will be fixed for the first 2 years of the contract. Ordering and payment • Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices. • Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys. • You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract. Form of contract The form of contract will be the JCT Measured Term Contract (MTC2024) KPIs • Completed Works Programme • Install Timeframe • Resident Satisfaction • Using Agreed Pricing • Aftercare (Snagging) • Client Handover Pass Rate • Client Health & Safety • Documents & Compliance Certifications

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete