The BEEMS (British EDF Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations. Cefas require a supplier to conduct intertidal Remotely Piloted Aircraft (RPA) flights, in accordance with the civil Aviation Authority (CAA) guidelines, to monitor potential coastal change and intertidal algal coverage for the Hinkley Point C (HPC) Nuclear New Build project to meet regulatory environmental monitoring requirements. RPA flights and photography are required: (1) along the Hinkley Point foreshore, and; (2) at Combwich Wharf and the surrounding banks of the River Parrett.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Contract for the Provision of Asbestos Surveying & Analytical Services 2025-30

Contract for the Provision of Asbestos Surveying & Analytical Services All surveying practices must be UKAS accredited and provide certification when submitting their tender return. All surveyors must be P402 (British Occupational Hygiene Society) qualified or equivalent and be able to demonstrate a level of competence. Detailed CV’s specific to asbestos surveying must be submitted with this tender to demonstrate competence for those surveyors who will work on the contract. Surveyors must be authorised to carry out each type of survey and property type as per UKAS RG8 requirements. All works on site and documented surveys must be in line with HSG264 (Asbestos: The Survey Guide). A competent project manager must be appointed by the Contractor(s), this named individual must hold either a P402 and or P405 qualification, or equivalent. A suitable CV must be provided with this return to demonstrate competency. Surveys and samples must be undertaken in line with the Control of Asbestos Regulations 2012 and HSG 264. A risk assessment and method statement must be provided for the sampling of assumed asbestos containing materials. A written quality management system must be used submitted with this return and as a minimum must include the following: - The proportion of surveys being re-inspected by another competent surveyor/auditor - The management procedures and systems of the organisation for auditing completed surveys - Systems for checking reports before issuing to the client

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline planned

Publish
Bid
Evaluate
Award