Maxwell Building 7th Floor Asbestos Remediation Project

Open

Buyers

Value

£0

Classifications

  • Asbestos-removal work

Tags

  • tender

Submission Deadline

2 weeks from now

Published

1 day ago

Description

The University is the single occupier of the Maxwell building. The building houses professional services, teaching spaces and a canteen located on the ground floor. The building is located centrally on the Peel Park campus and operates as the main campus reception. The Think Lab is located on the 7th floor, which is made up of staff offices and teaching rooms.
The University have been unable to access a number of ceiling voids throughout the 7th floor, due to the presence of asbestos containing materials in varied condition. The University are proposing to remove asbestos containing materials and undertake an environmental clean of a number of ceiling voids on the floor.
The project will briefly consist of:
• Protection of all retained surface finishes and building elements as required both within and outside work areas.
• Asbestos removal and remediation works, including associated analytical air monitoring
• Strip out of existing ceilings
• Alterations to the existing mechanical and electrical systems
• Installation of new ceiling systems
• Internal decorations
• Making good and commissioning works.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete