Framework for Fire Safety Works Contractors

Award

Value

£25,000,000

Classifications

  • Fire-prevention installation works

Tags

  • award

Submission Deadline

10 months ago

Published

4 months ago

Description

Kirklees Council is looking to work with competent suppliers to deliver passive fire protection services to carry out remediation work across Kirklees Homes & Neighbourhood buildings. Kirklees Council is due to complete Fire Risk Assessments (FRA) for all buildings that require one by October 2025, the number of FRA's due to be carried before this period is currently estimated to be 872.

The building types which will have FRA are as follows
- High Rise
- Low rise buildings
- Medium rise buildings
- Retirement living schemes
- Boiler Houses
- Offices

Kirklees are looking for the suppliers on this Framework to complete all the passive fire protection remedial Works recommended as part of these assessments. The work will result mainly from Fire Risk Assessment action plans and recommendations, but works could also arise from fire safety surveys, routine maintenance checks or planned fire safety programmes.

The Framework will be broken down into two Lots and be expected to cover the provision of:

• Lot 1 - Fire Doors Supply, Fit and Maintenance - Fire Door Installation (Door & Sets) and Fire Door Maintenance (total Lot value £15,000,000)
• Lot 2 - Fire Stopping - Small Penetrations (Mastic, Pipe Collars, Vents etc.) Large Openings (Blocks, Partitions, Board, Batts etc.)  (total Lot value £10,000,000)

Two Lots originally advertised (2024/S 000-029997) were abandoned:
• Lot 3 - Supply and Fit Fire Rated Glazing and Windows was abandoned due to a lack of competition.
• Lot 4 - Supply Only Fire Doors and Fire Doors Sets was abandoned due to unforeseen circumstances. 

The Contract will run for 2 years with a possible 2-year extension period to take the Contract to a maximum of 48 months.

The procurement documents are available to download from YORtender: https://yortender.eu-supply.com

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes

Karbon Homes require experienced and competent Contractors to deliver Compartmentation Surveys & Works and General Fire Safety Rectification Work. Lot 1 Compartmentation Surveys, Karbon Homes Operational areas 1-8 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of Karbon Homes' properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 2 Compartmentation Works, Karbon Homes Operational areas 1-8 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 3 General Fire Safety Rectification Works, Karbon Homes Areas 1-8 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal Lot 4 Compartmentation Surveys, 54 North Operational areas 9 & 10 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of 54 North properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 5 Compartmentation Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works to 54 North properties identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 6 General Fire Safety Rectification Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works to 54 North properties. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal As this is a Framework renewal, we are confident with our understanding of our requirements and in our understanding of the market. Therefore, no premarket engagement was undertaken for this Contract.

Katy Reed

Published 2 weeks ago
Open

Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes

Karbon Homes require experienced and competent Contractors to deliver Compartmentation Surveys & Works and General Fire Safety Rectification Work. Lot 1 Compartmentation Surveys, Karbon Homes Operational areas 1-8 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of Karbon Homes' properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 2 Compartmentation Works, Karbon Homes Operational areas 1-8 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 3 General Fire Safety Rectification Works, Karbon Homes Areas 1-8 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal Lot 4 Compartmentation Surveys, 54 North Operational areas 9 & 10 Karbon wish to appoint designated compartmentation survey providers to deliver surveys of 54 North properties. Karbon require an electronic survey report for each survey following the standard format and contents to be agreed at prestart meeting but should include as a minimum provision of colour report photographs, reference floor plans and an unpriced Compartmentation Survey Schedule. Lot 5 Compartmentation Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of fire compartmentation contractors to facilitate remedial works to 54 North properties identified from previous compartmentation surveys carried out by a third party. Also, to facilitate remedial works highlighted from fire risk assessments, general maintenance, servicing and future compartmentation surveys. Lot 6 General Fire Safety Rectification Works, 54 North Operational areas 9 & 10 Karbon wish to appoint a framework of contractors for General Fire Safety Rectification Works to 54 North properties. Within these lots all appointed contractors will be expected to act as Principal (and Main) Contractor and appoint any of Karbon Homes incumbent specialist sub-contractors, where specified to include but not be limited to the following specialisms: • Fire Alarm Systems • Access Control Systems • Dispersed Alarm / Telecare Systems • Asbestos Removal As this is a Framework renewal, we are confident with our understanding of our requirements and in our understanding of the market. Therefore, no premarket engagement was undertaken for this Contract.

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete