WCC - Nuneaton Library and Business Centre - Demolition

Award

Value

£650,000

Suppliers

Classifications

  • Demolition work

Tags

  • award

Submission Deadline

6 months ago

Published

5 months ago

Description

Name: Vicarage Street Development Site (The Buildings) Demolition.  

Nature: Demolition of existing Building structures (including slab / foundations, asbestos removal, basements, chimneys, isolation / disconnection of utilities etc.)  

Location: Powell House/Royal Mail Sorting Office/Wilko's, 1-3 Church Street, Nuneaton, Warwickshire, CV11 4DS.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Supply Chain Notice: WC1701345 - (DHE) CIDP25 Demolitions (Works) (CYPRUS)

The project consists of the demolition of 18 No. assets and associated infrastructure with the objective of returning the area to brownfield status. The work in its entirety is located within the confines of the Dhekelia Primary School. The scope also includes an element of asbestos removal that needs to be taken into consideration as part of this tender and includes the respective temporary storage of the asbestos at the transit asbestos compound in the EESA at Akrotiri. Furthermore, note that the works include the removal of underground services and associated earthworks. Maintenance of comprehensive data (type, weight, volume, tipping site) of the rubble waste and other scrap recyclable material collected and removed is a deliverable of this project. Substantial enabling works have already been carried out and therefore will not form part of the scope of this tender: - Isolation of services (water, electricity, telecommunications and sewage). - Surveys for asbestos demolition and quantification. - Surveys for European Protected Species. - VAT Surveys for scrap material. The Provisional Key Tender dates for the project are as follows: - Expression of interest: Wednesday 17/09/2025 - Expression of interest return: Tuesday 23/09/2025 - Invitation to Tender: Wednesday 24/09/2025 - Tender Return Date: Monday 20/10/2025 - Contract award: Friday 19/12/2025 - Commencement of work: Thursday 08/01/2026 - Completion of work: Tuesday 24/03/2026 The currency of this project is Euro (€). The location of this project is Dhekelia, Cyprus (British Forces). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 23/09/2025. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list

Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 2 days ago
Open

Northwest Contractor Framework

Wirral Borough Council (the "Council") as the Contracting Authority in partnership with Procure Partnerships intends to let a Closed North West Contractor Framework (the "Framework"). The Framework will have a maximum duration of four years and may be used to award contracts for the Council's pipeline of works and will be accessible by North West Public Sector Bodies / Contracting Authorities. The Framework consists of Thirteen Lots broadly categorised as Construction Lots (Lots 1-6) / Infrastructure Lots (Lots 7-12) / Demolition Lot (Lot 13). The Council aims to appoint Ten Contractors to each Framework Lot, except for Lot 13 Demolition which will have one single contractor. Lots 1 - 12 will be accessible by Public Sector Bodies / Contracting Authorities in the North West Region UKD). Lot 13 will be accessible by Public Sector Bodies / Contracting Authorities in the Merseyside Region UKD7 only. Where there are ten suitable applicants, the highest scoring ten Contractors for each Lot will be awarded a place on that Framework Lot, and will be ranked from one to ten: the highest scoring Contractor becoming the Rank 1 Contractor, the second highest becoming the Rank 2 Contractor etc. Should a Contractor decline to accept their offered place on the Framework, then a place may be offered to the next highest scoring Contractor (i.e., who may have come eleventh). The Council will also offer one reserve place to Lot 13 Demolition. The Reserve Contractor will be the Tenderer which ranked second. The Reserve Contractor may be brought on to the Framework at any stage during its term where the Council permanently excludes or terminates the Framework Agreement with a Contractor (having won a place on the Framework) for poor performance or otherwise (e.g., insolvency) as provided for in the Framework Agreement. The Reserve Contractor may be brought onto the Framework if the Rank 1 Contractor declines an opportunity from an End User for any reason. As such, the Reserve Contractor will to be required to sign a variation of the Framework Agreement at the point in time that they are invited onto the Framework. The intended number of ten Contractors per Lot may be varied: The maximum number of Contractors awarded a place on each Lot may increase only where two or more suppliers have tied scores, and are jointly placed in the last position (tenth) in respect of each Lot. In such a case, the Contractors who are tied with the same score in the last position for each Lot shall be deemed to be one Contractor for the purpose of calculating the maximum number of Contractors for each Lot. The Council will award a Framework Agreement to additional Contractors where their final score is within 0.01 - 1.00% of the awarded last place position only. For the avoidance of doubt, last position for each lot is tenth position. Only one contractor will be awarded a place on Lot 13 Demolition. One reserve place will be allocated to Lot 13. Where two or more Contractors have tied scores and are in any position except for the last (tenth) position for each Lot, the number of Contractors will fill the positions immediately following the position that they have tied for. For example, where two Contractors are tied in the sixth position, they will occupy the sixth and seventh positions. For example; where three Contractors are tied in the sixth position, they will occupy that sixth position as well as the seventh and eighth position respectively for the purpose of calculating the maximum number of Contractors in respect of the Lot in question. If less than ten Contractors meet the selection criteria to get on each Framework Lot, the Council reserves the right to proceed to establish the Framework with less than ten Contractors on each Lot or to cancel the procurement of that Lot. Further where a Contractor's total score (based on the technical and commercial award criteria) for a Lot ranks them within the top ten Contractors but is under 50%, then on the basis that the Council does not wish to compromise on the calibre of appointed Contractors, the Council reserves the right not to offer them a place on the Framework, and to proceed to award that Lot to less than ten Contractors.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete