Eastern Region - Reactive & Small Schemes Framework
Value
£3,075,960,000
Suppliers
Classifications
- Construction work
- Site preparation work
- Works for complete or part construction and civil engineering work
- Railway station construction work
- Railway bridge construction work
- Culverts
- Footpath construction work
- Surface work for footpaths
- Geotechnical engineering services
- Building construction work
- Buildings associated with transport
- Building installation work
Tags
- award
- contract
Published
4 weeks ago
Description
Network Rail procured a framework for Reactive and Small Scheme works covering its building and civil assets within the Eastern Region. The types of works to be procured under the framework will be reactive works and small schemes that are of low complexity. Such works predominately impact the operation of the railway and will cover the following categories of works: Reactive call outs (Emergency & Urgent) Planned Preventative Maintenance works (PPM) Small schemes The Reactive and Small Schemes framework is envisaged to be the Eastern Region's route to market to deliver such projects and requirements under NR's Strategic Business Plan during CP7. The framework will be lotted as outlined below covering the geographical scope of the Eastern Region (https://www.networkrail.co.uk/running-the-railway/our-regions/eastern/): Lot 1 - Civil Assets (Covering North & East, East Coast and East Midlands Routes) Lot 2 - Civil Assets (Covering Anglia Route) Lot 3 - Building Assets (Covering North & East, East Coast and East Midlands Routes) Lot 4 - Building Assets (Covering Anglia Route) To ensure supply chain resilience NR will retain the flexibility to allow Suppliers to work across Lots but only restricted to their specific discipline. This will only apply in instances where it has been deemed by NR that Suppliers within the relevant Lot under the same discipline cannot fulfil Network Rail's requirement(s). The initial term of the framework is 5 years with the option to extend for a further two periods of one year each. The indicative values provided for each of the Lots are estimates only, these are based on CP7 Strategic Business Plan budgets rather than delivery plan values. As such, they are not guaranteed and do not act as a minimum or maximum workbank value for the control period or a volume guarantee. The maximum value of the framework exceeds the combined value of the lots, this is so as the value is inclusive of the estimated values of optional extensions for the framework. Examples of work types to be covered and delivered under the scope of the framework include (but are not limited to): o Geotechnical - small scheme emerging works (from reactive), Maintain KVLs o Maintenance of foot bridges, under bridges, overbridges, tunnels, culverts, structural integrity o Rock cuttings, soil cuttings, earthworks first response etc o Buildings - small scheme emerging works (from reactive) o Structures - small scheme emerging works (from reactive), Structural integrity Negotiations to be conducted as part of the tender process will relate to the price element only. Participants will have an opportunity to update the pricing elements of their tenders following negotiations. Initial Tenders will be evaluated but feedback will not be shared with participants. Only feedback on Final Tenders will be shared following completion of evaluation of the tenders.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline complete
Complete