PCI_LotA_137 B567 Blashford Bridge Refurbishment / Replacement

Award

Value

£38,062

Suppliers

Classifications

  • Engineering services

Tags

  • award

Submission Deadline

8 months ago

Published

6 months ago

Description

A call-off from Lot A of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022).
Blashford Bridge carries the A338 between Ringwood and Fordingbridge over an EA main river. The bridge has suffered from spalling concrete to the soffit exposing corroded reinforcement. Repairs to this have failed and are difficult to carry out due to very low headroom.
This commission is to provide a view on options for repair of the bridge, if at all possible or, more likely, options for replacement.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete