Fire Damper PPM & Inspections

Award

Value

£0

Classifications

  • Fire-protection devices

Tags

  • award

Submission Deadline

10 months ago

Published

6 months ago

Description

Mersey & West Lancashire Teaching Hospitals NHS Trust serve a core population of over 600,000 with a combined workforce of around 9,000 highly committed and skilled staff delivering acute hospital care, intermediate care, primary care and community-based services. The Mersey Regional Burns and Plastic Surgery Unit at Whiston Hospital and the Northwest Regional Spinal Injuries Centre at Southport Hospital serves a population of over 4 million across the whole of Cheshire and Merseyside, The Isle of Man and North Wales.  Objectives for Sustainable Procurement  Sustainability in purchasing need not necessarily cost more and there is now a much wider choice of environmentally friendly products. "Green goods" are not necessarily more expensive; often if the 'whole life cost' of a product is considered the cheapest product is more expensive in the long run. Whole life costing means taking into account the total cost of an item over its lifetime such as raw materials sourcing, running costs, transportation, admin costs and disposal costs.  The overarching objective is for sustainability considerations to be addressed within the procurement cycle in all instances.   The more specific objectives in terms of sustainable procurement are:  To seek alternatives to products and processes which are detrimental to the environment and social well‐being by using more environmentally friendly and ethically traded products and processes. To minimise waste, including: any packaging, waste produced by the product (or service) in question, and waste generated by the eventual disposal of the product.  MWL are looking for a partner to carry out planned preventative maintenance and inspections to the fire dampers at Southport District General Hospital and Ormskirk District General Hospital. Inspections will be required to develop a detailed list of remedial work that has been identified and it will be the suppliers responsibility to carry out all of the remedials as per the specification.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete