Cemetery Wall repair

Complete

Buyers

Value

£20,000

Classifications

  • Building installation work
  • Building completion work
  • Miscellaneous repair and maintenance services

Tags

  • tender

Submission Deadline

18 minutes ago

Published

3 weeks ago

Description

During last winter, a tree was blown down, destroying a 20 metre section of wall around a closed cemetery. This will need to be sympathetically rebuilt. 
The wall is located at Coulter Lane, Burntwood, Staffordshire.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Windsor Boys' School D-Block Roof Replacement

The complete replacement of The Windsor Boys School D Block Roof. The roof has been split into 3 sections. The dimensions of the roofs are: Roof 1 - 800m2 Scope of works: • Strip existing tiles, felt & batten, renew with premium treated BS5534 - compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge tiles with Redland Concrete half-round ridge tiles and dry ridge kit. • Install new eaves trays, fascia vents and comb fillers. • Clear all waste and debris from site. • Scaffolding Roof 2 - 920m2 Scope of works: • Strip existing tiles, felt & batten, Renew with premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half-round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps. • Remove existing valley & install new dry valley trough. • Install new eaves trays, fascia vents & comb fillers. • Replace all lead flashing as required. • Clear all waste & debris from site. • Scaffolding • Remove existing Velux rooflights and install 8no PK08 & 3no FPK08 Velux units with associated flashings. Roof 3 - 520m2 Scope of works: • Strip existing tiles, felt & batten, Renew with Premium treated BS5534- compliant batten and install new high-quality breathable membrane. • Renew tiles with Redland Concrete Regent tiles. • Renew ridge/hip tiles with Redland Concrete half round ridge/hip tiles and dry ridge kit. • Remove existing verge & install new dry verge unit with end caps, • Install new eaves trays, fascia vents & comb fillers. • Clear all waste and debris from site. • Scaffolding All works must be guaranteed for 30 years

Katy Reed

Published 7 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete