Removal and Installation of Dubh Artach Entrance Platform
Buyers
Value
£50,000
Classifications
- Works for complete or part construction and civil engineering work
- Electrical engineering installation works
Tags
- tender
Submission Deadline
1 month from now
Published
1 day ago
Description
NLB have a requirement for the removal and installation of the entrance platform at Dubh Artach lighthouse, situated off the west coast of Scotland, approximately 70 miles south-west of Oban, at a position of 56º 08.0’ North, 06º 37.9’ West. The structure stands 38 meters high and is constructed from granite blocks. The light is at an elevation of 44 metres, flashes 2 white every 30 seconds, and has a range of 20 miles. The lighthouse tower is the only building on the rock outcrop. The tower is accessed by a vertical ladder from the base of the tower to a steel platform 9.8m above. The ladder is fitted with a fall arrest system that must be used when climbing the ladder. The primary access to Dubh Artach Lighthouse is by helicopter, and landing at this light is only to be carried out on the ebb tide. Due to the limited time window for helicopter operations the successful contractor will be required to stay on site, living within the lighthouse tower. An NLB technician will be on site for the duration of the works to supervise and maintain a functioning light. We are estimating 4 people in total staying at the lighthouse during the accessible periods outlined below, 3 maximum from the successful contractor and 1 NLB technician. Our requirement is for the removal of the existing aluminium entrance platform at Dubh Artach, then installing the replacement entrance platform to completion, currently being manufactured by a third party to NLB drawings specifications. Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB vessel & helicopter. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Works-for-complete-or-part-construction-and-civil-engineering-work./UE3TT9YQ93 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/UE3TT9YQ93
Similar Contracts
Open
Open
Blackpool and The Fylde College
Published 1 week ago
Open
Blackpool and The Fylde College
Published 1 week ago
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Organisation
Timeline active
Evaluate
Award
Complete