Service Level Agreement - Multi Disciplined Consultant Services for St Quintin HC

Award

Value

£26,510

Suppliers

Classifications

  • Boilers

Tags

  • award

Submission Deadline

9 months ago

Published

8 months ago

Description

Service Level Agreement - Multi Disciplined Consultant Services for St Quintin HC

Similar Contracts

Open

Barrhead Housing Association - Four Year Contract for Gas Servicing and Boiler Replacement Works

The Contract primarily involves Gas Servicing and Boiler Replacement Works though installation of new condensing combination boilers, controls and flues throughout tenant occupied properties within East Renfrewshire. Specifically the services and works are envisaged to include; An annual gas service and reactive maintenance (including parts) to each property, also including the recording, testing and service to existing smoke, heat and CO detectors. At the date of inviting tenders, Barrhead Housing Association require the annual gas service and reactive maintenance to be provided to 1,021no properties and Barrhead Housing Association office; Replacement of existing boilers with new condensing combination boilers, control and flues to approximately 89no properties during financial year 2026-2027 and 83no properties during financial year 2027-2028. Barrhead Housing Association may also require additional replacement works to boilers or full heating systems during the potential seven year contract period, which will be determined during the contract period once Barrhead Housing Associations budget’s and planned maintenance requirements become known for each financial year after the initial two year period of the contract; An annual service and reactive maintenance to 6no properties with existing electrical heating systems also including the recording, testing and service to existing smoke, heat and CO detectors; and Annual servicing of NIBE S735-7 Exhaust Air Heat Pump (EAHP) systems to 12no new build flatted properties in Barrhead Town Centre that are due for completion in late 2026 and may be included as a requirement by Barrhead Housing Association during financial year 2027-2028. The cost and rates annual servicing of the EAHP systems will be agreed as a variation between the Contractor and Barrhead Housing Association during the contract period. The Contract duration is four years (forty-eight months) from the commencement date of 1 April 2026 until 31 March 2030. Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be extended by a further years until 31 March 2033.

Open

Milnbank Housing Association - Two Year Gas Servicing and Legionnaires Disease Risk Assessment Contract

The Contract primarily involves Gas Servicing throughout tenant occupied properties within the Dennistoun and Haghill areas of Glasgow. The Contract will also include Legionnaires Disease Risk Assessment’s which will be undertaken to all properties at the same time as each annual gas service. The Legionnaires Disease Risk Assessments will exclude an inspection of water storage tanks and bidders are advised that Milnbank Housing Association have bypassed all common water storage tanks to flats within ownership of Milnbank Housing Association, which are all connected to a mains fed water supply. Bidders are further advised that they will not be required to enter loft spaces (including loft spaces above common close areas) during the contract as Milnbank Housing Association currently have a specialist Contractor who undertakes inspection’s of common water storage tanks to mixed tenure or fully factored blocks. It is also envisaged that any repair or follow up work’s identified by the Contractor’s Legionnaires Disease Risk Assessment’s undertaken during this contract will be carried out by Milnbank Housing Association’s existing specialist Contractor and not the Contractor that is successful in bidding for this opportunity. The Contract duration is two years (twenty-four months) from the commencement date of 1st April 2026 until 31st March 2028, and will primarily include an annual gas service and reactive maintenance (including parts) and Legionnaires Disease Risk Assessment’s to each property, the recording, testing and service to existing smoke, heat and CO detectors. The proposed works may also include the variation unquantified Modelcodes described within Tender Documents 2 (Pricing Matrix) and 6 (Activity Schedule). Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be further extended annually in twelve months increments up to a maximum of three years and an overall maximum contract period of five years.

Open

Energy Efficiency Dynamic Purchasing System (EEDPS)

Energy Efficiency Dynamic Purchasing System (EEDPS) Plymouth City Council (PCC), as the lead Contracting Authority, in collaboration with Independence Brokerage Services CIC (trading as Independence CIC (INCIC)), is establishing a Dynamic Purchasing System (DPS) for use by public sector bodies. This procurement framework is designed to deliver energy efficiency measures, retrofitting installations, and associated works for social housing and private domestic properties. It will also extend to other property types owned or managed by local authorities and public sector organisations. Eligible organisations are outlined in the Additionally, this initiative aims to: https://www.incic.org.uk/eligibility-criteria-eedps/ • Stimulate procurement opportunities for customers / clients wanting to and or are willing to self-fund energy efficiency works. • Support training and back to work via entry into the construction industry through green skills development and retrofitting • Providing access to green accreditations via umbrella organisations and providing opportunities for new entries to sector • Promote the use of Modern Methods of Construction (MMC), as detailed in the Lots below. * Details are clearly set out in this notice under Lots and Sub Lots and will be further detailed in specific calls for competition. For further details of Active Areas and Lots / Sub Lots can be found here https://www.incic.org.uk/about-plymouth-ee-dps/ Public sector bodies have a responsibility to advance energy efficiency initiatives through allocated funding and national or local grant schemes. These efforts aim to reduce carbon emissions, lower energy costs, and improve living conditions for residents. The EEDPS provides a structured, transparent, and flexible procurement framework to facilitate these goals. Objectives of the EEDPS The EEDPS is designed to enhance building energy performance, contributing to broader environmental, economic, and public health objectives, including: • Carbon Reduction: Addressing climate change through energy-efficient measures. • Economic Revitalisation: Investing in green skills and industries to stimulate local and national economies. • Public Health Improvements: Ensuring healthier living environments through energy-efficient upgrades. The DPS will be open for Contractor / Supplier (Providers) to apply to join from 18th February 2025. Further details of how to Join can be found at: https://www.incic.org.uk/about-plymouth-ee-dps/

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete