Supply of Inflatable Fenders

Award

Buyers

Value

£0

Suppliers

Classifications

  • Marine fenders

Tags

  • award

Submission Deadline

6 months ago

Published

5 months ago

Description

Border Force (BF) is a Directorate of the Home Office. BF operate a fleet of six (6) Coastal Patrol Vessels (CPV), all CPVs are equipped and certified to Maritime Coastguard Agency (MCA) MGN 280 Workboat Code of Practice, (HSVC) Category 2, for service in waters up to 60 nautical miles from a safe haven.

The full package of works required is detailed in the attached Statement of Requirements (SoR) SUPPLY OF INFLATABLE FENDERS

This opportunity will be let using the UK Government Short Form Terms and Conditions for Goods and Services (https://www.gov.uk/government/publications/the-short-form-contract).

The purpose of this notice is to make the SoR available to, and invite, potential suppliers to confirm they can fully meet the requirements.

This contract will be awarded following evaluation of bids for the provision and maintenance of marine fenders which meet the specification stated within the SOR.
The contract is expected to run for 4 years, with potential extension options.  Interested parties must meet eligibility criteria and submit bids in accordance with the tender documents.  

Therefore, the following timeline for this contract only is as follows;
1. 1700hrs, 26 February 2025 - deadline for clarification submission to the Buyer.
2. 1700hrs, 07 March 2025 - deadline for submission of bidding tool and specified documents and acceptances.
3. From 10 March 2025 - evaluation/moderation.
4. (On or around) 12 March 2025 - contract award.
5. 3 April 2025 - Contract Start; and
6. 2 April 2029 - Contract End.


The Buyer reserves the right to change or withdraw this opportunity, for any reason, at any point, prior to contract award.

Bidders are invited to submit compliant bids by email to; [email protected] no later than 1700hrs, 07 March 2025 quoting the procurement reference in the email subject line.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Oban Pier Upgrades

Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing The scope of works required are as follows: •Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required. •Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required. •Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required. •Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required. •Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required. •Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required. Potential replacement of galvanised steel ladders and access steps on a like for like basis will also be considered. We require the contractor to carry out the scope of works below: •Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location. •Provide a detailed tender submission of how they will carry out these upgrades •Full installation of the repairs and upgrades by the end March 2025. Timeline Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender – 28th August 2025 Mandatory site visit at Oban depot – proposed Monday 8th September 2025 Clarification deadline for suppliers – 16th September 2025 Tender return deadline – 25th September 2025 Tender Award – by 15th October 2025 Site mobilisation – 24th November 2025 Completion of project – By end March 2025 To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=976586808

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete