COV - CVLR Live Environment Construction Testing (LECT) Operator
Buyers
Value
£35,676
Suppliers
Classifications
- Railway transport services
- Public transport services by railways
Tags
- award
- contract
Published
1 month ago
Description
The Council are developing the innovative CVLR project. This seeks to introduce a low-cost urban light rail system into the heart of Coventry. The primary objective of the Coventry Very Light Rail Project is to create an affordable integrated transport system that comprises a lightweight low-cost vehicle and innovative trackform. The low cost means it can be implemented at scale, thereby driving significant mode shift to a low carbon mode, with an ambition to achieve zero carbon ultimately by using renewable energy to power the system. A full CVLR network is envisaged in the future but to allow this to be managed in a safe and effective manner, the first stage will be a CVLR Live Environment Construction Testing (LECT) route. CVLR LECT will be operational for a four (4) week period from Monday 19 May 2025 through Sunday 15 June 2025. The vehicle will be transferred to Coventry on Monday 19 May 2025. The awarded Operator will be required to perform some pre-work such as creation of Safety Management System ("SMS") and driver training. A vehicle operator is required to operate the CVLR vehicle through the period outlined above. A concept of operations (ConOps) has been developed and outlines how Coventry Very Light Rail (CVLR) Live Test Environment Construction Testing (LECT) is expected to be operated under normal, degraded and emergency scenarios.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Organisation
Timeline complete
Complete