Tender for the provision of asbestos survey reports

Award

Value

£6,000

Classifications

  • Health and safety consultancy services

Tags

  • award

Submission Deadline

6 months ago

Published

5 months ago

Description

This Contract is for the provision of Asbestos surveys at various Council properties. The scope covers management surveys only.

The Contractor shall provide the Services in corporate and commercial properties including domestic garages owned and/or managed by the Council.

An initial number of surveys are required to be completed by 31st March 2025. Following this, surveys will be called off as and when required during the contract period. The Council does not guarantee any minimum number of services to be completed during the Contract period.

Full details can be found within the invitation to tender document.

Additional information: This tender is being managed electronically. In order to express interest and download the invitation to tender documents, please go to the link above.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

INFRASTRUCTURE DEVELOPMENT AT CRINGLE DOCK WASTE TRANSFER STATION, SW8

This procurement exercise will be split into two lots, suppliers may bid for either one or both lots: Lot 1 - WASTE AND ENGINEERING CONSULTANCY SERVICES WRWA is seeking Technical Waste and Engineering support with the replacement of its Cringle Dock Waste Transfer Station, to include discussions with stakeholders, assessment of options, design and access plans, consents and permits, procurement of a construction contract, construction management and supervision, and implementation to support the achievement of ‘steady state’ operations at the future redeveloped Cringle Dock. The scope of this contract covers Waste and Engineering consultancy services. To expand, the services shall entail assisting the Authority with: • Overall facility design including waste and other supporting infrastructure; • Mechanical, civil, structural, geotechnical, utilities and other engineering disciplines as appropriate. • Fire protection measures to satisfy insurance requirement. • Environmental permitting; and • Development, co-ordination, management, and submission of engineering, technical, and permitting documentation as appropriate • Further scope of the works is as detailed in the documents provided as Volume Two. • The successful Tenderer must undertake all preparatory work and must commence full service provision under the Contract on the Commencement Date. • Please refer to the Specifications at Volume Two for further details. Lot 3 - ARCHITECT CONSULTANCY SERVICES WRWA is seeking Architectural support with the replacement of its Cringle Dock Waste Transfer Station. The adviser must act as WRWA’s Concept Guardians throughout the life of the project, to ensure the successful delivery of new infrastructure including the look, feel, and performance standards established by WRWA. The scope of this contract covers Architectural consultancy services. To expand, the services shall entail assisting the Authority with: • Concept Architect - (Riba Stages 0-3) Brief preparation, conceptual design of external appearance including development colour scheme from palate of materials (already specified within the DCO), conceptual layout and features, conceptual constructability, evaluation and approval of detailed designs, monitoring of detailed design implementation, approval of final finish. • Executive Architect - (Riba Stages 4-7) Detailed design for external and/or internal appearance as required in accordance with defined colour scheme and material palate including specification of materials and method of installation, ensuring constructability design, costing of detailed design, and implementation of detailed design, handover and use. While the consultant will act as the Concept Architect throughout the appointment, the successful Architect will only act as Executive Architect for those elements of the WRWA’s infrastructure development works which are developed under a traditional construction contract where WRWA directly employs a designer and construction contractor.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete