SIM Power Hall Historic Engine Electric Motor Drives

Open

Buyers

Value

£60,000

Classifications

  • Electrical engineering installation works
  • Mechanical installations
  • Mechanical engineering installation works
  • Installation services of electrical and mechanical equipment
  • Engineering design services for mechanical and electrical installations for buildings
  • Mechanical and electrical engineering services

Tags

  • tenderUpdate

Submission Deadline

1 week from now

Published

2 weeks ago

Description

The Science Museum Group seeks a supplier to finalise the design, manufacture, assemble, install, and commission electric drive systems for selected historic working machines (HWMs) in the Power Hall, Manchester. This work follows a preliminary audit (Stage 1) that defined the scope of work required. A detailed condition audit and benchmarking process (Stage 2) is currently underway and will run alongside this project. Please refer to the tender document pack for detailed information.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

BC5457 - Tir-y-Berth Primary School - LED Lighting

You are invited to submit a tender for the installation of LED lighting and associated works at Tir Y Berth Primary School, New Road, Hengoed CF82 8AU. The scope of the project is fully described in Tender Documentation but in summary the scope is: - The Electrical Services Installer shall allow for the safe isolation, removal and disposal of existing lighting as per the associated drawings. This forms part of Caerphilly CBC LAEF/Invest to Save Scheme. - The Electrical Services Installer shall allow for the supply and installation of new LED Light fittings and lighting as per the tender drawings. - The Electrical Services Installer shall allow for the installation of new emergency light fittings. This must include all required wiring alterations, cabling, GMS containment, key switches and sundry items. - The Electrical Services Installer shall allow for the installation of new lighting controls including all wiring alterations, cabling, GMS Containment and sundry items. They should also include for the inspecting and testing all existing lighting controls, any faults found shall be reported to the Contract Administrator. - The Inspection and Testing of all lighting circuits with results being provided to the Contract Administrator on Electrical Installation Condition Report Certificate. All emergency lighting works shall have an Emergency Lighting Certificate. - The provision of record drawings and O&M manuals. - Programme to be agreed with Contract Administrator and School

Katy Reed

Published 4 hours ago
Open

Removal and Installation of Dubh Artach Entrance Platform

NLB have a requirement for the removal and installation of the entrance platform at Dubh Artach lighthouse, situated off the west coast of Scotland, approximately 70 miles south-west of Oban, at a position of 56º 08.0’ North, 06º 37.9’ West. The structure stands 38 meters high and is constructed from granite blocks. The light is at an elevation of 44 metres, flashes 2 white every 30 seconds, and has a range of 20 miles. The lighthouse tower is the only building on the rock outcrop. The tower is accessed by a vertical ladder from the base of the tower to a steel platform 9.8m above. The ladder is fitted with a fall arrest system that must be used when climbing the ladder. The primary access to Dubh Artach Lighthouse is by helicopter, and landing at this light is only to be carried out on the ebb tide. Due to the limited time window for helicopter operations the successful contractor will be required to stay on site, living within the lighthouse tower. An NLB technician will be on site for the duration of the works to supervise and maintain a functioning light. We are estimating 4 people in total staying at the lighthouse during the accessible periods outlined below, 3 maximum from the successful contractor and 1 NLB technician. Our requirement is for the removal of the existing aluminium entrance platform at Dubh Artach, then installing the replacement entrance platform to completion, currently being manufactured by a third party to NLB drawings specifications. Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB vessel & helicopter. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Works-for-complete-or-part-construction-and-civil-engineering-work./UE3TT9YQ93 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/UE3TT9YQ93

Katy Reed

Published 1 day ago
Open

Capital Investment Works - 2026 to 2046

Southern Housing are seeking to procure up to 10 contractors to deliver Capital Investment Works across 10 operational Lots, 4 Lots for External elements (Windows, Roofs and non-fire Doors plus associated works) and 6 Lots for Internal elements (Kitchens and Bathrooms plus associated works) split on a geographical basis. The contracts also include provision for the following works to be included where required to the properties receiving Capital Investment Works to maximise efficiency of delivery and minimise disruption to residents: a) Fire safety works (only within the primary area of component renewal) b) Retrofit works (non-SHDF/WH: SHF etc.) and Bidders will be required to have the capability to fulfil the following roles in support of the contract delivery: a) Legal responsibility of Principal Designer and Principal Contractor roles under CDM b) Legal responsibility of Principal Designer and Principal Contractor roles under Building Safety Act requirements c) Quality assurance of work delivered by the contractors with provision of supporting evidence. As a contingency only, Bidders are also requested to price for the provision of asbestos surveying and removal works. This is to be provided in strict accordance with Southern Housing procedures and only when specifically instructed by Southern Housing. Southern Housing published a PIN and an Information Memorandum related to this procurement (Ref 2024-232366) on 22 July 2024 and have undertaken Pre Market engagement which has included: a) submission of questionnaire responses b) use of the questionnaire responses to understand the market and inform the procurement strategy c) completion of a market engagement event on 3 December 2024 and seeking feedback on the proposed procurement strategy d) forming an understanding of market capability e) sharing and seeking feedback on proposed lotting f) providing updates as to finalised lotting and the indicative procurement programme. Our Lots are: 4 Lots - External Elements - 1 Contractor per lot Lot 1 - LN - Ext - London North External Lot 2 - LS - Ext - London South External Lot 3 - SSX - Ext - Sussex External Lot 4 - KNT - Ext - Kent External 6 Lots - Internal Elements - 1 Contractor per lot Lot 5 - LN - Int - London North Internal Lot 6 - LSW - Int - London South West Internal Lot 7 - LSE - Int - London South East Internal Lot 8 - WSX - Int - West Sussex Internal Lot 9 - ESX - Int - East Sussex Internal Lot 10 - KNT - Int - Kent Internal Please note that all estimated Lot values stated exclude inflation. Bidders are able to tender for multiple Lots, Bidders will however, only be able to secure a maximum of 2 Lots across any combination of the External or Internal categories. Each Lot will be scored and evaluated individually and contracts will be awarded on the basis of the Most Advantageous Tender (MAT). The Contracts will be for an initial term of 10 years with an option to extend for up to a further 10 years, giving a total of 20 years. The Client is targeting the following strategic objectives and added value benefits: a) Contract rationalisation, flexibility, simplicity and versatility b) Creation of an integrated supply chain and standardised components providing: i) commercial incentives and benefits ii) financial savings iii) Consistent quality and customer experience d) Standardised approach to delivery and simple payment processes e) System integration of end to end activity f) Maximisation of guarantees/warranties and component lifecycles g) Delivery of social value outcomes h) Ideas and innovation The Client reserves the right, at its sole discretion, to update, modify or replace its strategic objectives or policies after the date of this Invitation to Tender by notification to the Bidders in writing. In accordance with section 52 of the Procurement Act 2023, wherever the Client enters into a public contract with an estimated value of more than £5 million, the Client must set and publish at least three key performance indicators in respect of the Contract. In light of the estimated value of the Contract, the Client has set the following indicative key performance indicators for the purposes of this procurement: KPI 1 - Performance Against Programme KPI 2 - Resident Satisfaction KPI 3 - Achieving Budget KPI 4 - Defects at Handover The contract extension options will be linked to performance and a programme of market testing as set out in the Invitation to Tender. This serves as a longer-term incentive and establishes testing of ongoing value for money. The Client will enter into Contract with the with the successful Contractor(s) which shall be based on the NHF Form of Contract 2023 (including a Schedule of Amendments).

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete